Basements and underground car parks sit in wet ground. Waterproofing them either stops water getting through the walls, called tanking, or lets it in and manages it, called drainage. Existing basements often need a mix.
The options
| System | How it works | Pros and cons |
|---|---|---|
| External tanking | Membrane on the outside of walls, against the soil | Most effective, but usually only possible during construction or with excavation |
| Internal tanking | Membranes or coatings on the inside face | Possible in existing basements, but must resist water pressure |
| Cavity drainage | A drained membrane or wall lining that collects water and takes it to a sump | Manages water without fighting pressure, needs a working pump |
| Crack injection | Resin injected into leaking cracks and joints | Targeted and quick, for specific leaks |
See crack injection.

Choosing for an existing basement
- Find where the water comes from first. It may be from above. See groundwater seepage.
- Check water pressure and wall design with an engineer.
- Consider how the space is used: storage, parking or habitable rooms.
- Plan pump maintenance if using drainage.
Lift pits and sumps
Lift pits are often the lowest and wettest point. See lift pit waterproofing.
Costs
Cost depends mainly on the source and the method. See basement leak repair costs.
How the right system helps
A dry basement protects cars, storage, services and the structure, and makes the space usable.
Basement waterproofing in Sydney
We repair and waterproof basements, garages and car parks. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 work. Call 0415 840 500 or book a free inspection.
Frequently asked questions
What is basement tanking?
A waterproof membrane or coating that stops water passing through basement walls and floors.
Is drainage better than tanking for basements?
For existing basements, drainage systems often work well because they manage water instead of fighting pressure. The right choice depends on the basement.
Can an existing basement be waterproofed?
Yes, usually with internal tanking, drainage, crack injection or a combination.


