Solar Panels on Apartment Roofs: Protecting the Waterproofing

20 November 2026 · 4 min read · By the METCON team

Solar panels on an apartment building roof can cut the cost of common area power. But a solar installation puts dozens of fixings, cables and frames onto a roof that has to stay watertight. Plan the roof before the panels go on.

Check the roof first

Panels are designed to last 20 years or more. If the roof membrane or sheeting has only a few years left, replace it first. Removing and reinstalling panels later to re-roof adds a lot of cost. See flat roof waterproofing.

Mounting methods

Roof typeCommon mountingWatch for
Metal sheet roofBrackets fixed to the sheeting or purlinsCorrect sealing at every fixing
Tiled roofHooks under the tilesCracked tiles from foot traffic
Concrete roof with membraneBallasted frames or engineered fixings with flashingsWeight on the slab, penetrations through the membrane

Ballasted systems avoid penetrations but add weight, and an engineer should confirm the roof can carry it, especially in wind.

Cables and penetrations

Cables need a properly flashed entry into the building, not a hole sealed with silicone. Route them together through one well-detailed penetration where possible. See roof penetration leaks.

Access and safety

Panels need maintenance and cleaning, so safe roof access and anchors or guardrails are needed. See roof anchors.

Approvals

Solar on common property needs owners corporation approval. Some installations need council approval. Check with the strata manager.

Roof works before and around solar

We assess and repair apartment roofs before solar goes on, and detail penetrations so they stay watertight. See waterproofing. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 apartment buildings. Call 0415 840 500 or book an inspection.

Frequently asked questions

Will solar void the roof membrane warranty?

It can, if the installation damages or penetrates the membrane without an approved detail. Check with the membrane supplier first.

Should we replace the roof before solar?

If the roof has less than about ten years left, usually yes. Ask for a roof condition check.

Can panels make leaks harder to find?

Yes. Water can enter under panels unseen. Good detailing and a roof inspection after installation help.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Strata Remedial Works
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote