Leaks Around Roof Plant and Penetrations on Apartment Roofs

20 November 2026 · 4 min read · By the METCON team

Flat roofs on apartment buildings carry a lot: air conditioning condensers, exhaust fans, vent pipes, antennas, solar panels and their mounts. Every one of them goes through or sits on the waterproofing. Over the years, as owners and contractors add equipment, roof penetrations become the most common source of top floor leaks.

How penetrations leak

  • Pipes or conduits sealed with silicone only, which fails within a few years.
  • Brackets screwed straight through the membrane.
  • Plant sitting directly on the membrane, wearing or puncturing it.
  • Penetrations too close together to seal properly.
  • Old, abandoned penetrations left open when equipment was removed.
  • Flashings lifted by wind or foot traffic.

Doing it properly

  • Flashing collars or pitch pockets designed for the membrane system.
  • Raised plant platforms on proper supports, so equipment never sits on the membrane.
  • Grouping services through fewer, well-detailed penetrations.
  • Walkways to protect the membrane on maintenance routes.
  • Removing redundant penetrations and patching to the system.

Control what goes on the roof

Many leaks start when an owner's air conditioning installer drills through the roof. By-laws and a simple approval process help: no penetration without approval, a detail that suits the membrane, and an inspection afterwards. See by-laws and waterproofing.

Finding the leak

Water travels under membranes and through slabs, so the leak inside is often not under the penetration that caused it. Flood testing sections of the roof, one at a time, finds it. See water ingress investigations.

Patch or replace?

If the membrane is near the end of its life, fixing penetrations one by one is a stopgap. A new membrane with properly detailed penetrations and plant platforms may be better value. See flat roof waterproofing.

Roof leak repairs

We find and fix roof penetration leaks and rebuild plant areas on apartment roofs. See waterproofing. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 apartment buildings. Call 0415 840 500 or book an inspection.

Frequently asked questions

Who pays when an owner's air conditioning installer causes a leak?

Often the owner responsible for the installation, depending on the by-laws and any approval conditions. The owners corporation usually fixes the roof first.

Can silicone fix a penetration leak?

Only briefly. A proper flashing designed for the membrane is the lasting fix.

Should we have a roof access register?

Yes. Knowing who went on the roof and what they did makes leaks much easier to trace.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Strata Remedial Works
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote