Water Ingress Investigations in Apartment Buildings

18 November 2026 · 4 min read · By the METCON team

In an apartment building, a leak in one unit can come from a balcony, bathroom, window, facade, roof or pipe somewhere else entirely. Water travels along slabs, through cracks and down walls before it shows. Repairs that guess at the source usually fail.

Where leaks usually start

Where you see waterCommon sources
Ceiling below a balconyBalcony membrane, drain, door sill
Around a windowWindow frame, sill flashing, facade cracks
Ceiling below a bathroomShower membrane, floor waste, pipes
Top floor ceilingsRoof membrane, box gutters, parapets
Basement walls and floorsGroundwater, planters, podium above
Staining under a balcony slab: the source is often above.
Staining under a balcony slab: the source is often above.

Investigation methods

  • History: when it leaks, after which weather, and for how long.
  • Moisture mapping: readings across ceilings, walls and floors to find the wettest point.
  • Flood testing: holding water on a balcony or wet area to see if it leaks. See flood testing.
  • Water testing: spraying windows and facade sections in sequence.
  • Thermal imaging: showing wet areas behind finishes.
  • Opening up: removing small areas to see the membrane, sill or substrate.

One test at a time

Test one possible source at a time, from the bottom up, so you know which one caused the leak. Testing everything at once tells you nothing.

Who pays for the investigation

If the source is likely to be common property, the owners corporation usually arranges and pays for the investigation. If it turns out to be lot property, such as an owner's renovated bathroom, the cost of repairs may fall to that owner. See apartment leaking into the unit below.

Report before repair

A short investigation report with photos, readings and the source saves money and arguments, and helps if an insurance claim or defect claim follows.

Leak investigations in Sydney

We investigate and repair leaks in apartment buildings across Sydney. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 apartment buildings. Call 0415 840 500 or book a free inspection.

Frequently asked questions

How long does a leak investigation take?

Simple leaks can be found in a visit. Intermittent leaks that only happen in certain weather may need several tests.

Will the investigation damage my apartment?

Opening up is kept small and made good, but some disturbance is often needed to find the source.

Can a leak come from two floors up?

Yes. Water can travel along slabs and down walls a long way before it shows.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Strata Remedial Works
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote