Courtyard Waterproofing for Ground Floor Apartments

20 November 2026 · 4 min read · By the METCON team

Many ground floor apartments have courtyards built over the basement car park. That courtyard is effectively a roof. It has a waterproofing membrane under the paving, soil and plants, and when that membrane fails, water drips into the car park or seeps into the unit.

Signs of a leaking courtyard

  • Drips, stains or stalactites in the car park ceiling below.
  • Damp skirting or flooring in the unit next to the courtyard.
  • Water ponding after rain.
  • Efflorescence on the car park soffit.

Common causes

  • Membrane damaged by tree and plant roots.
  • Drains blocked with soil or leaves.
  • No drainage layer, so water sits on the membrane.
  • Paving or soil built up above the door sill or membrane upturn.
  • Owners drilling or digging through the membrane for umbrellas, pergolas or garden edging.

Repairs

  1. Find the leak: flood testing in sections, and checking drains. See water ingress investigations.
  2. Remove paving, soil and planting.
  3. Remove the failed membrane and repair the slab.
  4. Install a new membrane with protection board, drainage layer and root barrier where planted.
  5. Reinstate drains, paving and planting at the right levels.

Who is responsible?

The slab and membrane are usually common property. The owner of the courtyard may have exclusive use and responsibilities under a by-law, including for paving and plants. Check the strata plan and by-laws. See who is responsible for repairs.

Owner changes to courtyards

Pergolas, planter beds and new paving can damage the membrane or raise levels above it. Owners should get approval before changing a courtyard. See damp ground floor units.

Courtyard waterproofing

We rebuild courtyards over basements with new membranes and drainage. See waterproofing and podium waterproofing. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 apartment buildings. Call 0415 840 500 or book an inspection.

Frequently asked questions

Can the courtyard be fixed without lifting the paving?

Rarely. The membrane is under the paving, so it usually has to come up.

Can I plant trees in my courtyard?

Only with care and approval. Roots damage membranes. Raised planters with their own waterproofing are safer.

Who pays for my plants and paving?

It depends on the by-laws. Exclusive use by-laws often make the owner responsible for finishes they control.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Strata Remedial Works
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote