Ground floor apartments are often the dampest in the building. Musty smells, bubbling paint, salt stains low on walls, mould behind furniture and lifting floors are common. The cause can be rising damp, water from outside, a leak, or condensation, and the fix depends on which it is.
The usual causes
- Rising damp: ground moisture rising through masonry where the damp proof course has failed or been bridged. See rising damp treatment.
- Garden beds and paving against walls: soil or paving built up above the damp proof course, so water gets into the wall.
- Poor site drainage: water ponding against the building after rain.
- Failed waterproofing: to planter boxes, courtyards or the slab edge.
- Plumbing leaks: in the slab or walls.
- Condensation: cold walls, poor ventilation and drying clothes inside.
See condensation, rising damp or a leak.

Finding the cause
Moisture readings at different heights, salt testing, checking ground levels against the damp proof course, and looking at the pattern after rain. A plumber may need to pressure test pipes. Guessing usually leads to the wrong fix.
Typical repairs
- Lowering garden beds and paving, and adding drainage.
- Injecting a new chemical damp proof course.
- Removing salt-damaged render and plaster and re-rendering with suitable materials.
- Waterproofing courtyards and planters.
- Improving ventilation, including subfloor ventilation where there is one.
Who pays?
Walls, slabs, damp proof courses and external drainage are usually common property, so the owners corporation is responsible for fixing the cause. Owners may need to deal with their own finishes and contents. See who is responsible for repairs.
Health
Persistent damp leads to mould. Occupants with asthma or allergies should not wait. See mould in apartments.
Damp repairs in apartment buildings
We diagnose and fix damp in ground floor units. See rising damp and mould remediation. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 apartment buildings. Call 0415 840 500 or book an inspection.
Frequently asked questions
Will a dehumidifier fix it?
It helps with condensation, but will not stop water coming in from outside or below.
Can my landscaping cause damp in my unit?
Yes. Garden beds built up against walls are one of the most common causes. Check by-laws before changing courtyard levels.
How long do rising damp repairs take to dry out?
Walls can take months to dry fully. Salt-damaged plaster is usually replaced rather than left to dry.

