When a building's balconies are remediated, the old tiles come up and new ones go down. Committees often leave the tile choice to the last minute, but it matters for safety, appearance and how well the new waterproofing is protected.
Slip resistance
Balconies get wet, so tiles need a slip resistance rating suitable for external wet areas. Tiles are tested and given a rating. Ask the supplier for the test certificate and choose a rating suitable for external balconies. Polished or glossy internal tiles are not suitable.

Size and falls
Balconies must fall to the drain. Very large format tiles are hard to lay to a fall without lippage or ponding. Medium sized tiles usually work best on small balconies. See water pooling on balconies.
Heat and colour
- Dark tiles get very hot in Sydney sun and expand more, which stresses grout and sealants.
- Lighter tiles stay cooler but show dirt.
- Mid tones are a common compromise.
Consistency across the building
Balconies are part of the building's appearance. Most owners corporations choose one tile for every balcony, approved at a general meeting or by the committee. Order spare boxes from the same batch and store them for future repairs.
Pedestals and pavers
On some balconies, pavers on adjustable pedestals over the membrane are an option. They make future access to the membrane easier and drain freely. See pedestal pavers.
Protecting the membrane
- Use the adhesive system compatible with the membrane.
- Leave movement joints at the perimeter and as required across the area.
- Use flexible sealant, not grout, at the junction with walls and upstands.
Balcony finishes done properly
We supply and lay balcony tiles as part of remediation, matched to the membrane system and laid to falls. See balcony repairs. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 apartment buildings. Call 0415 840 500 or book an inspection.
Frequently asked questions
Can owners choose their own balcony tiles?
Usually not. Balconies are often common property and part of the building's look, so the owners corporation chooses one tile.
Are large format tiles good for balconies?
They can be, but they are harder to lay to falls. On small balconies, smaller tiles usually drain better.
Should we keep spare tiles?
Yes. Keep several boxes from the same batch for future repairs.


