Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500
Structural

Termite Damage Repairs: Fixing Floors, Frames and Structure

30 October 2026 · 4 min read · By the METCON team

Termites eat timber from the inside, so damage is often far worse than it looks. Once a pest controller has dealt with the termites, the building damage still needs to be repaired properly.

Treat first, repair second

Always have a licensed pest controller confirm the colony is treated before structural repairs start. Repairing timber while termites are active only feeds them.

Assessing the damage

  • Probing timbers to find hollow or soft sections.
  • Checking floor bearers and joists in the subfloor.
  • Opening walls where frames are suspected.
  • Checking roof timbers and door and window frames.
  • An engineer's assessment where load-bearing members are badly damaged.

Common repairs

  • Floor joists and bearers: replaced or sistered with new timber, and floors re-levelled.
  • Wall frames: damaged studs and plates replaced, sometimes with temporary propping.
  • Roof timbers: rafters and battens replaced where damaged.
  • Door and window frames, skirting and architraves.
  • Floorboards and linings made good.

Reducing the risk next time

  • Fix leaks and damp: termites favour moist timber. See damp subfloors.
  • Improve subfloor ventilation.
  • Keep garden beds and soil below weep holes and away from timber.
  • Use treated timber or steel for replacement framing where suitable.
  • Keep regular termite inspections and barrier maintenance.

Termite damage repairs in Sydney

We work after your pest controller, repairing structure and finishes. See our structural remediation service or call 0415 840 500.

Frequently asked questions

Can termite-damaged timber be repaired?

Damaged members are usually replaced or reinforced with new timber after the termites are treated.

Is termite damage structural?

It can be, when bearers, joists, studs or roof timbers are badly damaged. An engineer may be needed.

Should termites be treated before repairs?

Yes. A licensed pest controller should confirm treatment before structural repairs start.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Civil & Structural
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote