The entry lobby and corridors are the first thing buyers, tenants and visitors see. In many older Sydney apartment buildings they are worn out: stained carpet, chipped walls, dim lights and tired letterboxes. A refurbishment lifts the whole building, but it pays to plan it properly.
Fix the building first
New finishes over old problems are money wasted. Before choosing colours, check for:
- Leaks or rising damp staining walls near the entry.
- Cracked or drummy floor tiles over a moving substrate.
- Concrete cancer in entry canopies or slab edges.
- Door thresholds that let water in during storms.
What a refurbishment usually includes
- New floor finishes: tiles, stone or commercial carpet.
- Wall repairs, new linings or feature panels, and painting.
- Ceilings, lighting and signage.
- Entry doors, intercom housing and letterboxes.
- Making good around fire doors, hydrants and exit signs.
Fire safety and compliance
Common areas are exit paths. Finishes, doors and lighting must keep fire doors working, exit signs visible and the path of travel clear. Floor finishes need suitable slip resistance, especially at entries that get wet. Any change to fire-rated walls or doors needs the right products and certification. See fire door defects.
Approvals
Like-for-like replacement is usually maintenance. A change in the appearance of common property, such as a new entry design or materials, may need a general meeting resolution, and some work may need council approval. Check with the strata manager early.
Staging for residents
- Keep at least one entry path open at all times.
- Do noisy and dusty work in set hours, with notice.
- Protect lifts and finishes used for access.
- Stage floors or corridors so no one is cut off.
Do it alongside remedial work
If facade or balcony works are planned, refurbish the lobby last, so trades and materials do not damage the new finishes. See capital works planning.
Common area refurbishment
We refurbish lobbies and common areas in occupied apartment buildings and fix the building issues underneath first. See building restoration and strata remedial works. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 apartment buildings. Call 0415 840 500 or book an inspection.
Frequently asked questions
How long does a lobby refurbishment take?
A typical lobby takes a few weeks, depending on finishes and lead times. Corridors on several floors take longer and are staged.
Does the committee need owners' approval?
It depends on the scope, the cost and whether the appearance changes. The strata manager can advise on the resolution needed.
Can we use the capital works fund?
Often yes, for replacing common property finishes. Check the fund plan and any spending limits on the committee.


