Most apartment buildings have a canopy or awning over the main entry. Some are concrete slabs cantilevered from the building, some are steel frames with glass, polycarbonate or metal roofing, and some are suspended from rods. They are right above the busiest path on the site, so any failure is a safety concern.
Common problems
- Concrete canopies: cracking, rust stains and spalling at edges and soffits. See concrete cancer in hoods and awnings.
- Steel frames: corrosion at connections, base plates and where water collects.
- Suspension rods and fixings: corrosion where they enter the wall, which is hard to see.
- Roofing: leaks, cracked glass or polycarbonate, blocked gutters.
- Drainage: water from the canopy draining onto the path or against the building.
Inspection
Canopies should be part of regular building inspections. A close look from a ladder or lift, checking connections and the wall fixings, is needed. Concealed fixings may need opening up. The engineer assesses whether the structure is still adequate.
Making safe
If concrete is falling or a canopy is visibly sagging, close the area below and use an alternative entry until it is assessed. Temporary propping may be needed.
Repair options
- Concrete repairs and protective coatings.
- Cleaning, treating and recoating steel, and replacing badly corroded members.
- New fixings into the building as the engineer designs.
- New roofing, gutters and drainage.
- Replacement with a new canopy if the old one is beyond repair.
Canopy repairs
We repair and replace entry canopies and awnings on apartment and mixed-use buildings. See strata remedial works. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 apartment buildings. Call 0415 840 500 or book an inspection.
Frequently asked questions
How often should an entry canopy be inspected?
As part of regular building inspections, and straight away if you see rust stains, cracks or sagging.
Can a canopy be replaced with a different design?
Yes, but it may need owners' approval and council or certifier approval, depending on the change.
Who is responsible for the entry canopy?
It is almost always common property, so the owners corporation is responsible.


