Many Sydney streets have mixed-use buildings: shops or restaurants on the ground floor, apartments above, sometimes offices in between. Remedial works in these buildings must keep businesses trading and residents living there, often under a strata management statement shared between different owners.
Typical problems
- Podium and terrace leaks into shops below. See podium waterproofing.
- Street awnings with corroded steel, failing hangers or leaking roofs.
- Shopfront leaks where apartments above drain onto awnings and entries.
- Grease and exhaust ducts from restaurants damaging roofs and facades.
- Concrete cancer in slab edges and balconies above busy footpaths.
Who makes decisions
Mixed-use buildings are often split into a residential strata scheme and separate retail or commercial lots, with a building management committee under a strata management statement. Shared items such as the facade, roof or podium may need agreement from more than one body. Start that conversation early.
Working around trade
- Do noisy works outside peak trading hours where possible.
- Keep shop entries and signage visible, with covered walkways where work is overhead.
- Coordinate deliveries and waste with shop operators.
- Footpath works and hoardings may need council approval.
Leaks into shops
Water leaking into a shop can mean stock damage and lost trade, so a fast make-safe response matters. Then find and fix the source above. See emergency leak response.
Mixed-use remedial works
We carry out remedial works in mixed-use buildings, working around shops and residents. See commercial remedial and strata remedial works. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 apartment buildings. Call 0415 840 500 or book an inspection.
Frequently asked questions
Who pays for an awning repair on a mixed-use building?
It depends on the strata plan and any strata management statement. It may be shared between residential and retail owners.
Can works happen at night?
Sometimes, but noise limits and council conditions apply. Quieter preparation can happen out of hours; noisy works usually cannot.
Do shops have to close during works?
Rarely. Good staging and protection usually lets them keep trading.


