Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500
Reports

Bathroom Renovation Defects in NSW: Your Rights and Evidence

20 November 2026 · 4 min read · By the METCON team

Bathroom renovations are one of the most common sources of building disputes in NSW. The room is small, but it brings together waterproofing, plumbing, tiling, electrical and carpentry, and a mistake in any of them shows up fast.

Common bathroom defects

  • Leaks from the shower into walls or the room below.
  • Water escaping the shower area onto the floor.
  • Floors that fall away from the drain.
  • Drummy, cracked or lippy tiles.
  • Poor grout and silicone, and mould within months.
  • Fixtures out of level or not as specified.
The layers of a wet area waterproofing system.
The layers of a wet area waterproofing system.

The rules that protect you

  • Licence: residential building work over $5,000 (including labour and materials) must be done by a licensed contractor.
  • Written contract: work over $5,000 needs a written contract, with more detailed requirements over $20,000.
  • Insurance: work over $20,000 needs home building compensation cover.
  • Statutory warranties: apply to the work, including due care and skill and compliance with the law. Waterproofing is a major element, which can matter for the six year warranty. See statutory warranties.

Check current thresholds with NSW Fair Trading.

What to document

  1. Photos and videos of the defects, dated.
  2. Any water damage in other rooms or units below.
  3. The contract, quote, plans and product selections.
  4. The waterproofing certificate, if one was provided.
  5. Messages with the contractor.

Proving a waterproofing defect

A leak is not proved by a stain. Testing, isolating plumbing and sometimes opening up a tile show where the water goes and why. See waterproofing defect claims.

Next steps

Give the contractor written notice and a chance to fix it. If that fails, lodge a complaint with NSW Fair Trading, then apply to NCAT if needed. See builder refuses to fix defects.

Bathroom defect reports

We test, report and price bathroom defects, and can carry out the rectification. See defect reports and fixed-price rectification quotes. The fee is fixed and agreed in writing before the inspection, so you know the cost of the report before you commit. METCON is a licensed builder (384697C) and DBP registered (BUP4254812), and we fix building defects for a living. Call 0415 840 500 or request a report or quote. We confirm a fixed fee in writing before we start.

This article is general information, not legal advice. For your situation, speak to a lawyer, NSW Fair Trading or the Tribunal.

Frequently asked questions

My tiler was not licensed. What now?

Unlicensed work over the threshold is an offence, and you may still have rights. Get advice from NSW Fair Trading.

Can a leaking shower be fixed without a full redo?

Sometimes small issues can be fixed locally. A failed membrane usually needs the tiles and membrane replaced. Testing decides.

Is mould in a new bathroom a defect?

It can point to a leak or poor ventilation. The cause decides whether it is a defect.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Inspections & Reports
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Need a report for NCAT, court or insurance?

Fixed fee agreed before we start. Clear findings, an itemised scope and a fixed-price rectification quote.

Call now Request Report