When something goes wrong in a strata building, owners often ask: will insurance pay? Sometimes yes. Often, at least partly, no. The answer usually depends on the cause.
The basic rule
| Usually insurance | Usually owners (levies) |
|---|---|
| Sudden storm damage | Wear and tear |
| A pipe that suddenly bursts | Leaks that have been happening for a long time |
| Impact damage | Concrete cancer and corrosion |
| Fire | Failed waterproofing from age |
| Some resulting damage | Defective building work |
Every policy is different. Check the product disclosure statement and ask the broker.
Resulting damage
Even when the cause is excluded, such as a failed membrane, some policies cover the sudden resulting damage, like a collapsed ceiling. The repair of the cause itself usually falls to the owners corporation.
Excesses
Strata policies often have high excesses, especially for water damage. Small claims may not be worth making, and claims history affects future premiums.
Defects in newer buildings
Defective building work is generally not insured. The remedy is usually against the builder or developer under the Home Building Act warranties. See claiming against the developer.
Evidence wins arguments
A builder's report on cause, with photos, readings and an itemised quote, helps the insurer decide, and helps the committee decide whether to claim or levy. See builder's reports for insurance.
Planning for the levy side
Work that insurance will not cover should be in the capital works fund plan, so owners are not hit with surprise special levies. See capital works planning and special levies.
Reports and repairs
We report on cause, scope and cost, and repair the damage and the defect behind it. See insurance reports. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 apartment buildings. Call 0415 840 500 or book a free inspection.
Frequently asked questions
Does strata insurance cover leaks from balconies?
Often not the repair of a failed membrane, which is usually maintenance or a defect, but possibly some sudden resulting damage. Check the policy.
Who pays the excess on a strata claim?
Usually the owners corporation, though some by-laws pass the excess to the owner responsible. Check your by-laws.
Should we claim for small damage?
Compare the repair cost with the excess and consider the effect on premiums. Your broker can advise.


