Storm Damage Insurance Claims: Builder's Report and Quote

19 November 2026 · 4 min read · By the METCON team

After a storm, home insurers often send their own assessor or builder. Sometimes the claim is accepted quickly. Often it is reduced or declined on the basis that the damage was caused by a pre-existing defect, wear and tear or gradual deterioration. An independent builder's report and quote puts your side on paper.

What the insurer is asking

  1. Was there a storm, as defined in the policy?
  2. What damage did the storm cause?
  3. Was any of the damage caused by something else, such as poor maintenance, a defect or gradual leaking?
  4. What will the covered damage cost to repair?
Make safe work, such as propping, should be photographed and kept on record.
Make safe work, such as propping, should be photographed and kept on record.

What our report covers

  • The damage, room by room and element by element, photographed.
  • Our opinion on cause, with reasons: wind, impact, rain entry through storm-created openings, or something pre-existing.
  • Where a pre-existing issue contributed, what part the storm played.
  • A scope of repairs to restore the damaged areas.
  • An itemised repair quote.

Common sticking points

Insurer saysWhat a report can show
The roof was old and wornWhether the storm, not age, lifted or broke the tiles or sheets
Water got in through a gradual leakWhether staining is fresh and matches the storm event
The fence or wall was already leaningWhether the failure matches wind or tree impact
The repair can be a patchWhy matching materials or a larger repair is needed

Act quickly, but carefully

  • Make safe straight away: tarps, propping and stopping water. Keep receipts. See make safe repairs.
  • Photograph before anything is removed.
  • Keep damaged materials until the insurer has seen them, if you can.
  • Lodge the claim promptly.

If the claim is declined

Ask for the reasons and the assessor's report in writing. Use the insurer's internal complaints process, and if that does not resolve it, the Australian Financial Complaints Authority (AFCA). An independent report is often what turns a decision around. See claim declined for wear and tear.

Insurance reports and quotes

We prepare insurance building reports and repair quotes across Sydney, and can carry out the repairs. The fee is fixed and agreed in writing before the inspection, so you know the cost of the report before you commit. METCON is a licensed builder (384697C) and DBP registered (BUP4254812), and we fix building defects for a living. Call 0415 840 500 or request a report or quote. We confirm a fixed fee in writing before we start.

This article is general information, not legal advice. For your situation, speak to a lawyer, NSW Fair Trading or the Tribunal.

Frequently asked questions

Can I use my own builder for the repairs?

Some policies let you choose, others offer a cash settlement or the insurer's builder. Check your policy and ask the insurer.

Does the insurer have to consider my report?

Insurers should consider relevant information you provide. A clear, reasoned report gives them something specific to respond to.

How soon should I get a report?

As soon as the site is safe, before repairs remove the evidence of what happened.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Inspections & Reports
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Need a report for NCAT, court or insurance?

Fixed fee agreed before we start. Clear findings, an itemised scope and a fixed-price rectification quote.

Call now Request Report