Flood damage is different from most other building damage. Water sits in walls, floors and subfloors, and the real damage often shows up weeks later. For an insurance claim, two things matter: how the water got in, and what it will take to restore the building properly.
Flood or storm?
Policies treat these differently. Flood generally means the covering of normally dry land by water that has escaped from a lake, river, creek, dam, canal or similar. Storm water is rain running off land or overflowing gutters and drains. Many policies cover both, some exclude flood or limit it. Check your policy wording and product disclosure statement.

What our report covers
- The water level reached, from tide marks, inside and out.
- How the water entered, with photos.
- Damage to each element: floors, linings, joinery, doors, framing, subfloor and services.
- Moisture readings and what needs removing versus drying.
- A scope to restore the building, and an itemised repair quote.
Why the scope is often bigger than it looks
- Plasterboard and insulation soaked by flood water usually need replacing.
- Particleboard flooring and joinery swell and fail.
- Subfloors and wall cavities need drying before closing up.
- Contaminated water raises health issues, so cleaning and sanitising matter.
- Mould grows quickly if drying is slow. See mould after water damage.
Straight after the flood
- Stay safe: keep away from electrics until checked by an electrician.
- Photograph and video everything before removing anything.
- Tell your insurer as soon as you can.
- Make safe and start drying, keeping receipts. See make safe repairs.
- Keep samples of damaged materials if the insurer has not inspected.
If the claim is disputed
Ask for the reasons and the assessor's report in writing, use the insurer's internal complaints process, and then the Australian Financial Complaints Authority (AFCA) if needed. See disagreeing with the insurer's scope.
Flood damage reports and repairs
We prepare insurance reports and repair quotes and carry out flood repairs. The fee is fixed and agreed in writing before the inspection, so you know the cost of the report before you commit. METCON is a licensed builder (384697C) and DBP registered (BUP4254812), and we fix building defects for a living. Call 0415 840 500 or request a report or quote. We confirm a fixed fee in writing before we start.
This article is general information, not legal advice. For your situation, speak to a lawyer, NSW Fair Trading or the Tribunal.
Frequently asked questions
Does my policy cover flood?
Many do, some do not or limit it. Check the policy wording or ask your insurer.
How long should walls dry before repairs?
Until moisture readings show they are dry. Closing up wet walls leads to mould and further claims.
Can I start repairs before the insurer inspects?
Make safe and drying, yes, with photos and receipts. Ask the insurer before permanent repairs.