Wall ties hold the two skins of a cavity brick wall together. In older buildings, especially near the coast, the steel ties can rust. The outer wall can then crack, bulge or become unstable. Replacing ties is often a fast repair that avoids rebuilding the wall.
Signs of wall tie corrosion
- Horizontal cracks in mortar joints, often at regular spacing.
- Bulging or bowing brickwork.
- Cracks at corners and around openings.
- Rust stains on joints.
See wall ties corrosion.

What affects the cost
- Wall area: how much wall needs new ties.
- Testing: checking the condition of existing ties first.
- Tie type: remedial helical or mechanical ties suited to the wall.
- Access: scaffold for upper levels. See access.
- Brick repairs: rebuilding badly bulged sections, stitching cracks.
- Isolating old ties: where rusting ties need to be cut out or isolated so they stop cracking the bricks.
- Finishes: repointing to match.
The process
- Inspect and test existing ties.
- Design the replacement pattern, with an engineer where needed.
- Install new remedial ties through the outer skin into the inner.
- Deal with old ties, where needed.
- Repair cracks and repoint.
When rebuilding is needed
If brickwork has badly bulged, sections may need to be taken down and rebuilt with new ties.
How it helps
New ties make walls stable and safe, stop the cracking and protect the building for decades.
Get a wall tie quote
We inspect and replace wall ties on homes and apartment buildings. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 work. Call 0415 840 500 or book a free inspection.
Frequently asked questions
How much does wall tie replacement cost?
It depends on wall area, testing, tie type, access, brick repairs and finishes. An inspection gives an accurate price.
How do I know if my wall ties are rusting?
Horizontal cracks at regular spacing, bulging brickwork and rust stains are common signs. Testing confirms it.
Can wall ties be replaced without rebuilding the wall?
Usually, yes. Remedial ties are installed from outside. Badly bulged sections may need rebuilding.


