Steel lintels support the brickwork over windows and doors. When they rust, they expand and crack the bricks above. Replacing them is a common job on older homes and walk-up apartment blocks, and the cost depends on several factors.
Signs you need lintel repairs
- Horizontal cracks above windows and doors.
- Rust stains or flaking steel visible at the edge.
- Bricks above the opening pushed up or out.
- Stepped cracks running up from the corners.
See rusted lintel replacement.

What affects the cost
- Length of opening: longer lintels need more brickwork removed and more propping.
- Number of lintels: doing several at once is usually more efficient.
- Height and access: upper floors may need scaffold.
- Repair or replace: some lintels can be treated, others need replacing.
- Brick matching: face brick needs matching bricks and mortar. Heritage homes take more care.
- Engineering: larger openings or structural concerns may need an engineer.
- Internal finishes: plaster, paint and window frames may need repair.
- Flashings: new damp proof flashings and weep holes. See weep holes.
The process
- Prop the brickwork above.
- Remove bricks over the lintel.
- Remove the old lintel and install a new galvanised or suitable lintel.
- Install flashing and weep holes.
- Re-lay bricks and repoint to match.
Walk-up apartment buildings
Many 1960s and 1970s walk-ups have dozens of lintels with the same problem. Doing them as a program saves on access. See red brick blocks.
How replacing lintels helps
New lintels stop the cracking, keep water out and protect the wall above. It is a fast repair with a long life when done properly.
Get a lintel quote
We replace lintels on homes and apartment buildings across Sydney. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 work. Call 0415 840 500 or book a free inspection.
Frequently asked questions
How much does lintel replacement cost?
It depends on the opening length, number of lintels, access, brick matching and finishes. An inspection gives an accurate price.
Can a rusted lintel be repaired instead of replaced?
Sometimes, if the rust is minor. Badly corroded lintels are usually replaced.
How long does lintel replacement take?
A single lintel can often be done in a day or two, plus time for finishes.


