If a building dispute goes to the NSW District Court or Supreme Court, the expert evidence rules in the Uniform Civil Procedure Rules 2005 (UCPR) apply. At their heart is the expert witness code of conduct in Schedule 7. An expert who does not follow it risks having their report excluded or given little weight.
The core duty
An expert witness has an overriding duty to assist the court impartially on matters within their expertise. Their paramount duty is to the court, not to the party paying them, and they are not an advocate for that party. This is the most important thing to understand when you engage an expert: you are paying for an honest opinion, not a supportive one.
The acknowledgement
Rule 31.23 requires the expert to comply with the code. Unless the court orders otherwise, a report cannot be admitted unless it contains an acknowledgement that the expert has read the code and agrees to be bound by it. Leaving it out is an easy way to lose evidence.
What the report must contain
In summary, the code requires the report to set out:
- The expert's name, address and qualifications.
- The questions the expert was asked to address.
- The facts, matters and assumptions the opinions are based on, and the reasons for each opinion.
- Any literature or other material relied on.
- Any tests or investigations relied on, and who carried them out.
- Any qualification needed so the report is not incomplete or inaccurate.
- Whether a question falls outside the expert's field.
- A brief summary at the start, if the report is long or complex.
Check the current Schedule 7 text before finalising any report.
Other duties
- Tell the party promptly if an opinion changes, and give a supplementary report.
- Comply with court directions.
- Work with other experts in conferences and joint reports, and not act on instructions to withhold agreement.
NCAT has its own version
At NCAT, Procedural Direction 3 sets out a similar experts' code and report requirements for home building claims over $30,000. See Procedural Direction 3 explained.
Why builders make good building experts
Courts want experts whose opinions come from real experience. A builder who rectifies defects every week can say how the work should have been done, how to fix it and what the fix really costs, and can defend those figures under cross-examination.
Court expert reports
We prepare expert witness reports for NSW courts written to the code, with itemised costings. The fee is fixed and agreed in writing before the inspection, so you know the cost of the report before you commit. METCON is a licensed builder (384697C) and DBP registered (BUP4254812), and we fix building defects for a living. Call 0415 840 500 or request a report or quote. We confirm a fixed fee in writing before we start.
This article is general information, not legal advice. For your situation, speak to a lawyer, NSW Fair Trading or the Tribunal.
Frequently asked questions
Can my expert talk to my lawyer while preparing the report?
Yes, lawyers give instructions and documents. But the opinions must be the expert's own, and the instructions should be disclosed in the report.
What happens if the expert changes their mind?
They must tell the party who engaged them promptly and provide a supplementary report. That is part of the duty to the court.
Does the code apply to single or court-appointed experts?
Yes. The code applies to any expert witness engaged or appointed to give evidence.