The driveway ramp into an apartment building's car park takes every car, every delivery truck and every storm. Over the years ramps crack, drains fail, surfaces get slippery and water ends up in the basement.
Common problems
- Cracked or broken concrete, especially at joints and edges.
- Trench drains with broken grates, failed frames or blocked channels.
- Water running past the drain into the car park.
- Slippery surfaces, worn grooving or failed coatings.
- Spalling where reinforcement has rusted.
- Uneven joints that are trip hazards on pedestrian paths.
Why water gets in
A ramp drain has to catch heavy rain running down a steep slope. If the grate is too narrow, the channel blocked or the falls wrong, water jumps it. Car park flooding often starts here. See basement car park flooding.
Repair options
| Problem | Typical repair |
|---|---|
| Cracks in an otherwise sound ramp | Crack repair, joint sealing, coating |
| Failed trench drain | Cut out and replace with a heavy-duty drain set in new concrete |
| Slippery surface | Re-grooving or an anti-slip coating |
| Badly broken slab | Saw-cut, remove and re-pour sections |
| Rusted reinforcement | Concrete cancer repair |
Keeping residents moving
A ramp is often the only way in and out. Works are staged: half the width at a time where possible, or short closures planned with notice, with temporary parking and access for emergency vehicles. New concrete needs curing time before cars can drive on it, so the program has to allow for that.
Ramps over structure
Where the ramp sits over the car park slab, cracks can let water and salts into the structure below. Waterproofing may be needed under the new surface. See traffic deck coatings.
Driveway and ramp works
We repair driveways, ramps and trench drains at apartment buildings. See concrete repairs and strata remedial works. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 apartment buildings. Call 0415 840 500 or book an inspection.
Frequently asked questions
How long before cars can use a new ramp section?
It depends on the concrete mix and weather. We plan the staging so residents always know when they can drive on it.
Can the trench drain be made bigger?
Often yes. A wider or deeper drain, or an extra drain higher up the ramp, can stop water reaching the car park.
Who approves driveway works?
Common property works are approved by the owners corporation. Works at the boundary or footpath crossing may need council approval.