Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500
Strata

Paving and Path Repairs on Strata Common Property

20 November 2026 · 4 min read · By the METCON team

Paths, courtyards and driveways are used by everyone in the building, every day. When pavers lift, concrete cracks or surfaces turn slippery, people trip and fall. The owners corporation has a duty to keep common property in good repair, and paving is often where injury claims start.

Common problems

  • Pavers lifted by tree roots.
  • Sunken paving over soft or washed-out bedding.
  • Cracked concrete paths with raised edges.
  • Slippery surfaces, especially in shade or near pools.
  • Water ponding on paths, or running towards the building.
  • Loose or broken stair nosings and edges.

Make it safe now

Mark or cordon off trip hazards straight away, and record when the hazard was found and what was done. Then plan the permanent repair.

Why paving fails

Most failures come from what is under the surface: poor base preparation, no compaction, water washing out the bedding, or roots. Relaying pavers on the same failed base just brings the problem back.

Repair options

  • Relay: lift pavers, rebuild and compact the base, and relay with correct falls.
  • Replace: new concrete or pavers where the old material is broken or slippery.
  • Tree roots: root barriers or rerouting paths, with the right approvals for significant trees.
  • Drainage: grated drains or regrading so water runs away from the building.
  • Slip resistance: treatments, honing or replacement with a suitable surface.

Paving over waterproofing

Courtyards and paths over basements sit on a waterproofing membrane. Lifting them without care can damage it. See courtyard waterproofing.

Paving repairs for strata

We repair paths, courtyards and driveways on strata common property. See concrete works and strata remedial works. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 apartment buildings. Call 0415 840 500 or book an inspection.

Frequently asked questions

Is the owners corporation liable if someone trips?

It may be, if it knew or should have known about the hazard and did not act. Fix hazards promptly and keep records.

Can we remove a tree that is lifting paving?

Tree removal often needs council approval. Root barriers or path changes may avoid removal.

Is a concrete path better than pavers?

Each has pros and cons. Pavers are easier to lift and relay; concrete is more uniform. The base and drainage matter most.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Strata Remedial Works
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote