Strata Won't Fix a Leak? Your Options as an NSW Owner

5 November 2026 · 4 min read · By the METCON team

You have reported the leak. The committee has discussed it. A plumber has been out twice. And your ceiling is still wet. It is a very common problem in NSW apartment buildings, but owners do have options.

This is general information from a builder. It is not legal advice, so talk to a strata lawyer for your situation.

What the law requires

Under section 106 of the Strata Schemes Management Act 2015 (NSW), an owners corporation must maintain and repair common property. It generally covers waterproofing, slabs and many external elements. An owner who suffers loss from a breach may be able to claim for it, and there are strict time limits. Under that section, a claim must generally be started within 2 years of the owner first becoming aware of the loss, so get advice early. See who is responsible for repairs.

Balcony damage on an apartment building.
Balcony damage on an apartment building.

Steps to take

1. Put it in writing

Email the strata manager and committee with dates, photos and how the leak affects you. Ask them to reply in writing, and request a place on the next meeting's agenda.

2. Keep records

  • Dated photos and videos, particularly during rain.
  • A log of when it leaks and what the weather was doing.
  • All emails, reports and invoices.
  • Any loss, such as rent, furniture or health-related costs.

3. Get evidence of the cause

Committees often stall because the cause is not clear. A report from a builder, leak specialist or engineer can show whether it comes from common property. See balcony leak detection and water from above.

4. Propose a solution

Give the committee something to approve: a scope, a quote and a staged plan. See getting owners to approve works.

5. Mediation

NSW Fair Trading offers a mediation service for strata disputes, and this is generally needed before the tribunal.

6. NCAT

If that fails, you can apply to the NSW Civil and Administrative Tribunal for orders, which may require the owners corporation to carry out work. In more serious matters, a lawyer can advise on damages.

Protect your apartment in the meantime

  • Report urgent hazards such as water near electrics straight away. See strata leak emergencies.
  • Dry out the area and watch for mould. See mould after a leak.
  • Do not do your own repairs to common property without approval.
  • Tell your contents insurer.

If you are on the committee

You usually have to balance limited funds and competing priorities, but delay rarely saves money. Get advice, record decisions and tell the owner what is happening. See managing remedial projects.

How getting it fixed helps everyone

A leak that is fixed properly protects the slab and neighbouring apartments, reduces the risk of a claim, and helps keep values up across the building.

Independent leak inspections

We can inspect leaks, explain the likely cause and provide a written scope and quote for the committee to consider. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 work. Call 0415 840 500 or book a free inspection.

Frequently asked questions

What can I do if strata will not fix a leak?

Put it in writing, keep records, get evidence of the cause, try NSW Fair Trading mediation and, if needed, apply to NCAT. A strata lawyer can advise on your options.

What is section 106 in NSW strata law?

Section 106 of the Strata Schemes Management Act 2015 sets out the owners corporation's duty to maintain and repair common property, and an owner's ability to claim for loss from a breach, subject to time limits.

Can I fix the leak myself and bill strata?

Generally, avoid this without written approval. Work on common property usually needs owners corporation approval, and reimbursement is not guaranteed.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Strata Remedial Works
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote