Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500
Strata

How to Brief a Remedial Engineer for a Strata Building

19 November 2026 · 4 min read · By the METCON team

Many strata remedial projects start with a remedial engineer: investigating the problem, specifying the repair and preparing documents for tender. The quality of that work depends a lot on the brief. Here is how to write one.

1. Describe the problem

  • What owners are seeing: leaks, cracks, spalling, falling render.
  • Where: which units, balconies or elevations.
  • Since when, and whether it is getting worse.
  • Photos, owner complaints and any previous reports.

2. Say what you want

  1. An investigation and condition report.
  2. Repair options with pros, cons and likely cost range.
  3. A specification and drawings for the chosen repair.
  4. Tender documents and help assessing tenders.
  5. Inspections during the works and sign-off.

You may only need the first stage now. Ask for each stage to be priced separately.

3. Testing and access

Concrete testing, flood tests and opening up give real answers. Ask the engineer what testing they recommend and who will provide access, scaffold or a builder to open up and make good.

4. Tell them about constraints

  • Occupied building, working hours and by-laws.
  • Budget and capital works fund position.
  • Heritage listing or conservation area.
  • Deadlines, such as an AGM or warranty expiry.

5. Ask the right questions

  • Is the engineer experienced in remedial work on Class 2 buildings?
  • Are they a registered design practitioner where the Design and Building Practitioners Act applies?
  • Who will do the site work, and how often will they inspect during construction?

See the DBP Act and remedial work.

Engineer-led or design and construct?

Some projects suit a builder-led approach, with the builder engaging the engineer. See design and construct vs engineer-led.

Working with your engineer

We price and build engineers' remedial specifications, and can provide access and opening up for investigations. See strata remedial works. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 apartment buildings. Call 0415 840 500 or book an inspection.

Frequently asked questions

Do we need an engineer for every remedial job?

No. Smaller like-for-like repairs often do not. Structural repairs, concrete cancer, waterproofing redesigns and DBP Act work usually do.

Should we get more than one engineer's proposal?

Comparing two or three proposals on the same brief is good practice and helps show the committee acted properly.

Can the builder help with the brief?

Yes. An experienced remedial builder can help describe the problem and arrange access and testing.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Strata Remedial Works
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote