How Much Contingency for Strata Remedial Works?

18 November 2026 · 4 min read · By the METCON team

The most common reason strata remedial projects go back to owners for more money is an unrealistic contingency. Remedial works are full of unknowns, and the budget needs to allow for them.

Why remedial works need more contingency

  • You cannot see inside slabs, walls and membranes until you open them.
  • Concrete cancer is usually more extensive than it looks.
  • Old buildings hide old repairs, and sometimes hazardous materials.
  • Access and staging can change once work starts.

How much?

There is no single right number. It depends on how much investigation has been done.

Level of investigationUncertainty
Visual inspection onlyHigh: allow a generous contingency
Engineer's report with testingMedium
Opening up at sample locationsLower
Measured schedule of ratesLower, but quantities still vary

Your engineer or project manager should recommend a contingency based on what is known. Many remedial budgets carry a noticeably larger contingency than new building work.

Reduce uncertainty early

Money spent on investigation before tender is usually well spent. Concrete testing, sample break-outs and flood tests turn guesses into known quantities. See concrete testing.

Approving the contingency

Approve the contract sum and the contingency together at the general meeting, and say how the contingency can be spent. That avoids a second meeting for every surprise. See AGM motions.

Reporting to owners

  • Contingency used and remaining, each month.
  • What each draw was for, with photos.
  • Forecast to completion.

What if contingency is not used?

It stays in the fund. Money that is levied but not spent can stay in the capital works fund for future work, depending on the resolutions passed.

Realistic remedial budgets

We help committees understand where the unknowns are before work starts. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 apartment buildings. Call 0415 840 500 or book a free inspection.

Frequently asked questions

Is contingency the same as a provisional sum?

No. A provisional sum is in the builder's contract for known but unpriced work. Contingency is the owners' allowance for unknowns.

Should the builder see the contingency?

Many committees keep it separate from the contract so it is only drawn on for approved variations.

What happens if we run out of contingency?

The committee may need approval for more funds. Good reporting gives early warning.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Strata Remedial Works
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote