Heavy Sydney storms show up every weakness in a building's stormwater system. Water backs up from blocked pits, overflows box gutters, floods courtyards and finds its way into basements and ground floor units. Many leaks blamed on waterproofing are really drainage problems.
Common problems
- Pits and grates blocked with leaves, silt and rubbish.
- Pipes cracked or pushed out of line by tree roots.
- Downpipes discharging onto paving instead of into pits.
- Courtyards and paths that fall towards the building.
- Undersized pipes and pits for the roof and paved area.
- Failed or missing pump-out systems in basements.
- Box gutters and rainwater heads too small to cope. See box gutter overflows.
Finding the problem
A CCTV camera inspection of the pipes, a look at the system in heavy rain, and a check of falls and levels usually find the cause. Plans of the drainage system, if the strata records have them, help a lot.
Who is responsible?
Stormwater pipes, pits and drains that serve the building are usually common property, so the owners corporation must maintain them. Where pipes run through a lot or connect to council's system, the boundaries can be more complex. See who is responsible for repairs.
Typical fixes
| Problem | Fix |
|---|---|
| Blocked pits and pipes | Jet clean and set up a maintenance routine |
| Root-damaged pipes | Relining or replacing sections |
| Water ponding against walls | Regrade paving, add grated drains |
| Undersized system | New pits, larger pipes or extra outlets |
| Water into the basement | Driveway grated drains, waterproofing, pump checks |
Drainage connections and pipework are done by licensed plumbers and drainers. We carry out the civil and building work around them: excavation, concrete, paving, pits and waterproofing. See basement flooding.
Maintenance
Pits, grates and gutters should be cleaned on a schedule, more often near trees and before storm season. It is the cheapest way to prevent water damage.
Drainage and civil works for strata
We fix the civil side of stormwater problems at apartment buildings. See civil works and strata remedial works. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 apartment buildings. Call 0415 840 500 or book an inspection.
Frequently asked questions
How often should stormwater pits be cleaned?
At least once or twice a year, and more often under trees. Check before storm season.
Can a blocked drain cause a leak inside a unit?
Yes. Water backing up from a blocked balcony or courtyard drain often enters through door sills and walls.
Who fixes a drain that runs under one lot?
If it serves common property, usually the owners corporation. The strata plan and by-laws decide.