The traditional way to procure strata remedial works is: engineer investigates, writes a specification, the job goes to tender, a builder is chosen and only then does the builder see the building properly. On complex remedial projects, that sequence can lead to surprises, variations and delays. Early contractor involvement is an alternative.
What it means
A remedial builder is engaged early, alongside the engineer, to help with investigation, buildability, staging, access and budget before the scope is finalised. The builder may then price the works, or the owners corporation may still go to tender.
Why it helps
- Better investigation. The builder can open up test areas so the scope is based on what is actually there.
- Buildable details. Practical input on waterproofing details, sequencing and materials.
- Realistic budgets. Cost advice before owners vote, rather than surprises at tender.
- Access and staging. Planning scaffold, resident access and noisy works early.
- Fewer variations. Fewer unknowns once works start.
Keeping it fair
- Pay the builder a clear fee for the early stage.
- Agree whether the builder can price the main works.
- Keep the engineer independent and responsible for the design.
- Use open-book pricing or benchmark against market rates.
When it suits
It suits complex or urgent projects, buildings with unknown construction, and situations where owners need a reliable budget before voting. For simple, well-defined jobs, a standard tender may be enough. See strata remedial tenders and design and construct vs engineer-led.
Talk to us early
We work with engineers and strata managers from the investigation stage, including opening up and buildability advice. See strata remedial works. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 apartment buildings. Call 0415 840 500 or book an inspection.
Frequently asked questions
Does early contractor involvement mean no tender?
Not necessarily. The owners corporation can still tender the main works, or negotiate with the early contractor if pricing is benchmarked.
Does it replace the engineer?
No. The engineer stays responsible for the design. The builder adds practical and cost input.
Is it more expensive?
There is a fee for the early stage, but it often saves more through fewer variations and delays.