Practical Completion and Handover of Strata Remedial Works

19 November 2026 · 4 min read · By the METCON team

Practical completion is the point where the works are finished apart from minor defects, and the owners corporation can use the building again. It triggers important things in the contract: the defects liability period starts, part of the retention is often released, and the builder's responsibility for the site ends. Do not rush it.

The completion inspection

  • Walk every area of the works with the builder and the engineer or superintendent.
  • Check against the scope and specification, item by item.
  • Flood test balconies and wet areas where waterproofing was replaced.
  • Check finishes, sealants, drainage and making good.
  • Check the common areas and units used for access are clean and undamaged.

The defects list

Minor items are listed, with a date to fix them. Major incomplete work usually means the works are not yet at practical completion.

Documents to collect

  • Waterproofing and structural certificates.
  • Engineer's inspection records and sign-off.
  • Product and system warranties.
  • Workmanship warranty and contract warranties.
  • Insurance details, including home building compensation cover where it applies.
  • Photo records of every stage, especially hidden work like membranes and reinforcement.
  • As-built drawings and a maintenance schedule.
  • DBP Act documents for Class 2 work, where required.

See handover checklist and remedial works warranties.

Store them properly

These records matter for the next ten years: insurers, buyers' strata reports, future works and any claim. Keep them with the strata records, not in one committee member's inbox.

Diarise the end of the defects period

Inspect again before the defects liability period ends and give the builder written notice of any defects. Then release the remaining security if all is fixed. See retention and security.

Our handovers

We hand over a full photo record, certificates and warranties at completion. See strata remedial works. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 apartment buildings. Call 0415 840 500 or book an inspection.

Frequently asked questions

Who decides practical completion?

Usually the superintendent or project manager under the contract, after inspection.

Can we refuse practical completion?

If the works are not complete except for minor defects, yes. The contract sets out the test.

What if a leak appears after completion?

Report it in writing straight away. It will be fixed under the defects liability period or warranty if it relates to the works.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Strata Remedial Works
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote