Roof Replacement on Walk-Up Apartment Blocks in Sydney

19 November 2026 · 4 min read · By the METCON team

Thousands of Sydney walk-up apartment blocks built between the 1950s and 1970s still have their original roofs. Terracotta and concrete tiles crack and slip, mortar ridges crumble, sarking is missing or perished, and box gutters rust through. At some point patching stops being value for money.

Signs the roof is near the end

  • Repeated leaks into top floor units after heavy rain.
  • Many cracked, slipped or porous tiles.
  • Crumbling ridge and hip mortar.
  • Rusted valleys, flashings or box gutters.
  • No sarking under the tiles, or sarking that has torn and sagged.
  • Sagging roof lines, which can point to timber framing problems.
Scaffold and edge protection come first on any roof replacement.
Scaffold and edge protection come first on any roof replacement.

Repair or replace?

Usually repairUsually replace
A few broken tiles and some ridge pointingWidespread cracked or porous tiles
One rusted valley or flashingRusted gutters, valleys and flashings throughout
Leaks traced to one detailLeaks in many places, year after year

A condition inspection with photos from the roof itself gives the committee the evidence to decide, and the basis for a capital works plan. See capital works planning.

Check for asbestos first

Older blocks may have asbestos cement in roof sheeting, gutters, flues or eaves. It must be identified before work starts, and removal is done by licensed asbestos removalists. See asbestos in older buildings.

What a full replacement includes

  • Scaffold and edge protection, with access through common areas planned.
  • Stripping tiles or sheets and checking the timber framing.
  • Repairs to rafters, battens and fascias as found.
  • New sarking, battens, tiles or metal roofing.
  • New gutters, valleys, flashings and downpipes sized for today's rainfall.
  • Roof anchors where needed for future maintenance. See roof anchors.

Approvals and owners

Roof replacement is common property work. Like-for-like replacement is usually maintenance under the duty to repair, but changing the roof material or form may need approval from council and the owners. Plan for weather: a roof is replaced in sections so units are never left open overnight.

Roof works for strata buildings

We plan and carry out roof repairs and replacement on occupied apartment buildings. See strata remedial works. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 apartment buildings. Call 0415 840 500 or book an inspection.

Frequently asked questions

How long does a walk-up roof replacement take?

For a typical walk-up block, a few weeks of roof work plus scaffold time, depending on size, weather and what is found under the tiles.

Can residents stay during the works?

Usually yes. The roof is replaced in sections and made weathertight every night.

Is a new roof a special levy item?

It depends on the capital works fund. Many schemes plan it over several years so a large levy is not needed.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Strata Remedial Works
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote