Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500

Hotels & Hospitality ยท Sydney & NSW Hotel remedial works, staged so you keep trading.

Hotels, motels, pubs with rooms and serviced apartments are Class 3 buildings that work every night of the year. We repair concrete, structural steel, waterproofing, bathrooms, facades and roofs floor by floor, so rooms come back on line quickly and guests are not disturbed.

  • Hotels, motels and pubs
  • Class 3 buildings
  • Floor-by-floor staging
  • Structural steel and concrete
  • Heritage hotels
  • Free site inspection
Talk directly with the builder0415 840 500

Free remedial inspection

Builder calls you back

No obligation. We never share your details.
40+
Years building across Sydney
$0
Site assessment and written quote
24h
Itemised quote after the site visit
$20M
Public liability insurance cover
Why hotels are different

Every closed room is lost revenue.

A hotel earns money from every room every night. Remedial work has to be planned around occupancy, events and peak seasons, with noisy work at the right times and rooms handed back in blocks as soon as they are finished.

Hotels also wear hard. Bathrooms are used every day by different people, balconies face the weather, roofs carry plant, and older hotels have steel and concrete that is decades past its life. When guest rooms are refurbished without fixing what is behind the walls, the new finishes fail early.

We have done this on a heritage hotel: on the Great Northern Hotel in Newcastle we stripped rooms back to structure, replaced corroded beams, repaired concrete cancer, demolished 200 internal walls, cut 200 new openings and poured a 200 square metre roof slab.

New structural steel beam installed in a hotel room
DBPRegistered builder
Is this you?

When hotels call us

If any of these sound familiar, it is worth a free site visit. We will tell you straight what your site needs.

Leaking guest bathrooms

Water damage to rooms and ceilings below, often from failed waterproofing under tiles.

Concrete cancer

Spalling balconies, slab edges, car parks and awnings over entries.

Corroded structural steel

Rusted beams and lintels in older hotels and pubs, often found during refurbishment.

Roof and plant leaks

Flat roofs, box gutters and plant decks leaking into top-floor rooms.

Facade and window leaks

Rain through old render, brick and window frames.

A refurbishment that keeps finding problems

Hidden defects found once rooms are stripped back.

Planning a refurbishment or chasing a leak? Send us the defect list or a few photos and we will tell you what to fix first.

Hotel room stripped back to structure before a new steel beam
Our hotel project

A heritage hotel, rebuilt from the structure out.

The Great Northern Hotel is a heritage Class 3 hotel. Rooms were stripped back to the original structure so every defect could be seen. Floors were propped before load-bearing masonry or steel was touched, corroded beams were replaced with new structural steel, and concrete cancer was cut back, treated and rebuilt.

The project also included 200 internal walls demolished, 200 new openings formed, redundant doorways infilled in matching brick and a 200 square metre concrete roof slab. Read the full Great Northern Hotel case study.

  • Corroded beams replaced with new steel
  • Concrete cancer cut back and rebuilt
  • 200 walls removed and 200 openings formed
  • 200 square metre roof slab poured
Staging

Keeping the hotel open while we work.

Most hotels cannot close. We work floor by floor or in room blocks, with the work area separated from guest areas, its own access where possible, and noisy work such as demolition, coring and concrete break-out kept to agreed hours.

Before starting, we agree the room release schedule with management so sales can plan around it. Rooms are handed back in blocks, cleaned and ready to sell. Read hotel facade remediation while open and the hotel refurbishment planning guide.

Refurbished hotel corridor after remedial and structural works
Waterproofing membrane being applied in a bathroom
Guest bathrooms

Bathrooms that stop leaking for good.

Guest bathrooms are the most common source of hotel leaks. Showers are used every day, grout wears, and waterproofing under old tiles fails at the floor waste, the hob and the wall junction. Water then damages the slab and the ceiling below.

We strip the bathroom, repair the slab, set correct falls, waterproof and flood test before tiling, and rebuild. Done as a program, the same method is repeated room by room so every bathroom ends up the same. See hotel bathroom waterproofing leaks.

Rules and approvals

What the DBP Act means for hotels.

Hotels are Class 3 buildings. The Design and Building Practitioners scheme already regulates remedial work on Class 2 apartment buildings. For Class 3 buildings, the NSW Government has stated that remedial work is excluded from the scheme until July 2028, so check the current position before you plan. A hotel with apartments above may already be covered for the Class 2 part.

Whatever the rules, structural and waterproofing repairs should still follow an engineer's design and the right approvals. METCON is DBP registered (BUP4254812), so the work can be documented to the Class 2 standard now. Read hotel remedial work and the DBP Act.

Corroded steel beam and cracked concrete in a ceiling
What we repair

Remedial works for hotels.

One builder for the structure, waterproofing and building envelope, so your refurbishment is built on a sound building.

01

Structural Steel & Beams

Corroded beams replaced, openings formed and floors propped and strengthened.

02

Concrete Cancer Repair

Balconies, slab edges, car parks and awnings repaired to the engineer's design.

03

Bathroom Rectification

Guest bathrooms stripped, waterproofed, tested and rebuilt in room blocks.

04

Facades & Windows

Render, brickwork, sealants and window perimeters repaired.

05

Roofs & Plant Decks

Membranes, box gutters and penetrations made watertight.

06

Heritage Hotels

Original fabric kept where it can be, with matching brick and render.

Recent work

Hotels projects.

A selection of recent hotels projects across Sydney.

View all projects
Our process

Planned around occupancy.

We plan the work with your general manager and engineer around occupancy, events and peak seasons.

Inspection & Diagnosis

We attend site, inspect the defect and its surroundings, and identify the cause rather than just the symptom. Where needed we take photos, moisture readings and cover measurements.

Scope & Engineering

We coordinate a remedial or structural engineer where required and agree a written scope of works that fixes the cause, not only the visible damage.

Itemised Quote

You receive a clear, itemised written quote with methodology, materials, access, programme and any approvals. No vague lump sums.

Remediation

Our crew carries out the work to the engineer's specification and Australian Standards, with progress photos and hold-point inspections at each critical stage.

Handover & Warranty

Final inspection, clean-up and a handover pack: photos, product data, engineer sign-off where applicable, and your statutory warranty under the Home Building Act 1989.

Rooms back on line, floor by floor.

A staged program agreed with your management team, noisy work at agreed times, and rooms handed back in blocks with a full record of what was done.

Why choose METCON

Remedial builders who have done it on a hotel.

Licensed builder 384697C and DBP registered BUP4254812. Our Great Northern Hotel project is a full remedial and structural overhaul of a heritage Class 3 hotel.

Cause, Not Cosmetics

We diagnose why the defect happened. Patching over the symptom is why so many repairs fail twice.

DBP Registered

DBP General Unrestricted (BUP4254812). Qualified for Class 2 apartment remedial work under the Design and Building Practitioners Act 2020.

Licensed & Insured

Builder Licence 384697C, $20M public liability, workers compensation and HBCF cover where required.

Engineer-Coordinated

We work with remedial and structural engineers from diagnosis to sign-off, so the fix is designed, not guessed.

Documented Properly

Photos, product data, hold-point records and certification. Exactly what strata committees, insurers and buyers ask for.

40+ Years Experience

Hands-on remedial and heritage work across Sydney since the 1970s, including jobs other builders turned down.

What our clients say

Rated 5.0 by Sydney clients.

5.0

Real reviews from homeowners, strata and builders.

My partner and I own an original 1920s semi-detached home in Vaucluse, with complex sandstone foundations and multiple structural challenges caused by previous defective works. After years of delays, failed consultants, and no progress, I met Constatine and his team. From the beginning, I was impressed by the detailed review of our plans and the identification of numerous discrepancies that previous builders had missed. The team supported us through lengthy council negotiations, neighbour consultations, and COVID-related delays, even before contracts were signed. Once construction commenced, Constatine and the Meteora Constructions team were exceptional. Progress remained on schedule despite heavy rain, unforeseen structural issues, and highly complex underpinning works that previous builders had refused to undertake. They completed the work efficiently and at significantly less cost than other builders had quoted. I cannot speak highly enough of Constatine and METCON Remedial Services. It is no understatement to say that engaging Constatine and his team saved not only our project, but probably our marriage as well.
SBSteven Brown Vaucluse
We have been undertaking a considerable repair and restoration of our 1850 residence in Darlinghurst. Constatine and his team completed outstanding work, all at a very competitive price. Every deadline was met with no increase to the original quote. Their knowledge, gathered over many years, and their incredible eye for detail significantly improved the final outcome beyond what was originally proposed. I rate them very highly and would recommend them wholeheartedly.
NDNicholas Davie Darlinghurst
Constatine and his team did an excellent job repairing and waterproofing our garage ceiling and walls, which had been affected by concrete cancer and sandstone erosion. Constatine is highly experienced in remedial works and provided clear advice, transparent costings, and recommended the best products available to ensure a long-lasting result. We highly recommend METCON for specialist remedial works.
JJames Cremorne
Hotel Remedial Works FAQ

Common questions.

Straight answers from the builder. Anything else, just ask.

Can the hotel keep trading during remedial works?

In most cases, yes. We work floor by floor or in room blocks, keep the work area separate from guests, and keep noisy work to agreed hours.

Have you done remedial work on a hotel before?

Yes. Our Great Northern Hotel project in Newcastle was a full remedial and structural overhaul of a heritage Class 3 hotel. The case study is on our Projects page.

Do hotel remedial works need a DBP registered builder?

The NSW Government has stated that remedial work on Class 3 buildings, such as hotels, is excluded from the DBP scheme until July 2028. A Class 2 part, such as apartments in the same building, may already be covered. Check the current position for your building.

Can you fix the structure as part of a refurbishment?

Yes. It is the best time to do it. Fixing steel, concrete and waterproofing while rooms are stripped stops the new finishes failing early.

Do you work outside Sydney?

Yes. We work across NSW, including Newcastle and regional areas.

More remedial services

Other remedial services.

Remedial problems rarely come alone. Leaks cause concrete cancer, damp causes render failure. We fix the whole chain.

Back to Remedial Building
Helpful guides

Know more before you start.

Plain-language guides from our team on the questions we are asked most.

Where we work

Hotel remedial works across NSW.

Hotels, motels, pubs and serviced apartments across Sydney, Newcastle and regional NSW.

Let's get started

Need remedial work on your hotel?

Send us your defect list, engineer's report or a few photos and we will come back with next steps and a staging plan.

Phone, direct to the builder0415 840 500 Email plans or photosinfo@meteoraconstructions.com.au
Open 7 days7am to 7pm, reply within 1 business day
Service areaSydney and surrounding NSW
Call now Free Quote