Motels often have long brick blocks, exposed walkways, shared roof spaces and bathrooms that back onto each other. They can be practical buildings to refurbish, provided age and past alterations are understood.
Walk the outside first
- Roof sheets, tiles, flashings and gutters.
- Cracked brickwork and rusted lintels.
- Balcony and walkway concrete.
- Loose or low balustrades.
- Stormwater and water against walls.
- Carports and signs.
A room can look fine while the external walkway above is failing.
Open two different rooms
Choose one corner and one middle room, on different levels if possible. Look behind bathrooms, below windows and above ceilings. Test suspected asbestos before disturbing it.
Group the bathrooms
Back-to-back bathrooms may share pipes. Renovating pairs or complete rows can be more sensible than closing single rooms across the site.
Keep some rooms earning
Split the motel into zones with their own safe access, power, water and parking. Place the noisy zone away from occupied rooms and avoid blocking the only driveway.
Fix levels and drainage
A new door or path may expose that the ground falls towards rooms. Correct drainage before replacing flooring, especially where slabs are low.
Avoid expensive partial upgrades
If the roof must come off in three years, do not spend heavily on ceilings beneath it now. Either bring the roof forward or choose temporary finishes honestly.
When buying
Price the roof, wet areas and structure separately from decoration. Read due diligence, room checklist and brickwork repairs.
Call 0415 840 500 or book an inspection. METCON is a licensed NSW builder (384697C) and DBP registered (BUP4254812).
Frequently asked questions
Can a motel be renovated while open?
Yes, often by block or wing, if services, parking and noise can be separated.
Are motels usually Class 3?
Many are, but check approved plans and the actual use.
What is the first thing to repair?
Anything unsafe, then roof and water entry, then bathrooms and finishes.