Buying a Hotel: Building Due Diligence Checklist

25 November 2026 · 4 min read · By the METCON team

A hotel inspection should help the buyer understand the next few years of spending, not only list chipped paint. The building, business and contracts all need advice from the right people.

Ask for the records

  • Occupation and fire certificates.
  • Approved plans and alterations.
  • Leak and maintenance logs by room.
  • Facade, roof, pool and structural reports.
  • Warranties and current contracts.
  • Planned capex and unresolved claims.

Missing information should become a question or a price allowance.

Walk by system

Start at the roof, follow water to lower levels, inspect a sample of rooms on each riser, then check the car park and ground. Visit after rain if timing permits. Rooms closed as "maintenance" deserve an explanation.

Find expensive access

Facade concrete, plant supports and high windows may need scaffold or swing stage. A small repair at height can have a larger access cost than the concrete itself.

Test shutdowns

Ask what must close to replace a riser, switchboard or membrane. Operating revenue can be affected across several floors.

Build a three-year cost table

  1. Must do now for safety or law.
  2. Likely repair of building fabric.
  3. Room refresh and brand work.
  4. Owner's optional improvements.
  5. Unknowns needing access or testing.

Do not count the same wall in both building and refurbishment budgets.

Time investigation properly

Contract periods may be shorter than a facade or concrete investigation. Use the available time on risks that could change price or the decision. Follow with deeper testing under agreed contract terms.

Read property improvement plans, capex and cost factors.

Call 0415 840 500 or book an inspection. METCON is a licensed NSW builder (384697C) and DBP registered (BUP4254812).

Frequently asked questions

Is a standard building inspection enough?

Usually not for a hotel. Roof, structure, facades, fire and services may need separate specialists.

Can the seller's report be relied on?

Check its date, purpose, limits and whether the buyer has permission to rely on it.

Should we inspect rooms that are occupied?

A representative sample may be arranged, with closed rooms and complaint history checked too.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Commercial Construction
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote