Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500

Government & Public Buildings ยท Sydney Remedial works for public buildings.

Schools, libraries, community halls, council depots, public housing and government offices all need concrete, waterproofing, facade and structural repairs. We work to your specification and procurement rules, keep the public safe around the work, and document everything for your asset records.

  • Councils and state agencies
  • Schools and community buildings
  • Public and social housing
  • Public safety around the work
  • DBP registered BUP4254812
  • Free site inspection
Talk directly with the builder0415 840 500

Free remedial inspection

Builder calls you back

No obligation. We never share your details.
40+
Years building across Sydney
$0
Site assessment and written quote
24h
Itemised quote after the site visit
$20M
Public liability insurance cover
Why public buildings are different

Public money, public places, public records.

Public buildings are used by everyone, from children and older people to staff and the general public. Many are old, heavily used and maintained on tight budgets, so repairs are often deferred until something leaks, cracks or falls. When the work happens, the site still has to stay safe for people walking past.

Government and council clients also need a clear paper trail. Quotes have to be comparable, variations have to be justified, and the asset owner needs records of what was found and what was repaired. A scope that is clear at the start saves arguments and budget overruns later.

We work to your engineer's specification or schedule of works, follow your procurement and site rules, and give you photos, test results and product records at handover so the next person managing the asset knows exactly what was done.

METCON team briefing a client on a remedial site
DBPRegistered builder
Is this you?

When public buildings call us

If any of these sound familiar, it is worth a free site visit. We will tell you straight what your site needs.

Concrete cancer in older buildings

Spalling slab edges, columns, awnings and car parks on public buildings.

Roof and gutter leaks

Flat roofs, box gutters and roof plant leaking into halls, classrooms and offices.

Facade and render failures

Cracked render, drummy surfaces and loose pieces over footpaths and entries.

Public housing apartment blocks

Balconies, walkways, stairs and facades on older apartment buildings.

Pool and amenities buildings

Concrete and waterproofing damaged by chlorine, salt and constant wet use.

Condition audit with no builder

An asset condition report or engineer's scope that needs pricing and delivering.

Have a condition audit, engineer's scope or schedule of works? Send it through and we will price it line by line.

Remedial works on a multi-storey building facade
Procurement

Quotes your procurement team can compare.

Public clients usually need prices that line up against each other and against the budget. We price to your specification or schedule of works, line by line, and we show allowances, provisional sums and exclusions clearly, so nothing hides in a lump sum.

If the scope is still loose, we will tell you which items need investigation first, rather than guessing. Where unknowns are unavoidable, such as concrete repair quantities, we price them as rates so the final cost follows what is actually found. Read government building remedial works for what agencies should expect.

  • Line-by-line pricing to your schedule
  • Rates for quantities that cannot be measured yet
  • Exclusions and assumptions stated up front
  • Licence, registration and insurance details on request
Public safety

Keeping the public safe around the work.

Public buildings sit on busy streets, school grounds and community spaces. Before work starts we plan hoardings, overhead protection, pedestrian routes and deliveries, and we get the council permits needed for scaffold or work zones on public land. See scaffold and hoarding permits.

On schools and community sites we work to the site's own rules for sign-in, supervision and working hours, and we keep noisy and dusty work away from times when the building is full.

Scaffold set up along a building facade
Spalled concrete cut back to the reinforcement at a slab edge
Older public buildings

Decades of deferred maintenance, fixed properly.

Many public buildings date from the 1950s to the 1980s. They were built with thin concrete cover, early membranes and steel lintels that are now well past their life. Leaks and concrete cancer that have been patched for years usually need a proper repair: find every affected area, cut back to sound concrete, treat or replace the steel and protect the surface.

Doing the whole elevation or roof at once, under one access setup, usually costs less over the life of the building than coming back every year. Read about council and community building remedial works.

Public and social housing

Government-owned apartment buildings.

Public and community housing includes many older walk-up and mid-rise apartment blocks. Most are Class 2 buildings, so remedial work on them generally falls under the Design and Building Practitioners Act and needs a registered builder, regulated designs and compliance declarations, unless an exemption applies.

METCON holds DBP General Unrestricted registration (BUP4254812). We work with the provider's engineer and tenancy team so residents know what is happening and when. See our Class 2 builder page for how the DBP process works.

Older apartment building with damaged balconies
What we repair

Remedial works for public buildings.

Concrete, waterproofing, facade and structural repairs for buildings owned or managed by councils, agencies and public housing providers.

01

Concrete Cancer Repair

Slab edges, columns, awnings, car parks and walkways repaired to the engineer's design.

02

Roof & Gutter Repairs

Flat roof membranes, box gutters and plant penetrations made watertight.

03

Facade Remediation

Render, brickwork, lintels and sealants repaired, with the public kept clear.

04

Class 2 Public Housing

Remedial works on government-owned apartment buildings by a DBP registered builder.

05

Structural Repairs

Strengthening, steel replacement and repairs with engineering design.

06

Pools & Amenities

Concrete, waterproofing and wet area repairs for aquatic and amenities buildings.

Recent work

Government & Public projects.

A selection of recent government & public projects across Sydney.

View all projects
Our process

Specification to handover records.

We follow your procurement and site rules, from the quote or tender through to the asset records at handover.

Inspection & Diagnosis

We attend site, inspect the defect and its surroundings, and identify the cause rather than just the symptom. Where needed we take photos, moisture readings and cover measurements.

Scope & Engineering

We coordinate a remedial or structural engineer where required and agree a written scope of works that fixes the cause, not only the visible damage.

Itemised Quote

You receive a clear, itemised written quote with methodology, materials, access, programme and any approvals. No vague lump sums.

Remediation

Our crew carries out the work to the engineer's specification and Australian Standards, with progress photos and hold-point inspections at each critical stage.

Handover & Warranty

Final inspection, clean-up and a handover pack: photos, product data, engineer sign-off where applicable, and your statutory warranty under the Home Building Act 1989.

A clear record for the asset owner.

Itemised pricing, justified variations, hold-point photos, product records and a handover pack your asset team can file and use.

Why choose METCON

A remedial builder for public assets.

Licensed builder 384697C with DBP General Unrestricted registration BUP4254812 and $20M public liability cover, working with asset managers, engineers and project managers across Sydney.

Cause, Not Cosmetics

We diagnose why the defect happened. Patching over the symptom is why so many repairs fail twice.

DBP Registered

DBP General Unrestricted (BUP4254812). Qualified for Class 2 apartment remedial work under the Design and Building Practitioners Act 2020.

Licensed & Insured

Builder Licence 384697C, $20M public liability, workers compensation and HBCF cover where required.

Engineer-Coordinated

We work with remedial and structural engineers from diagnosis to sign-off, so the fix is designed, not guessed.

Documented Properly

Photos, product data, hold-point records and certification. Exactly what strata committees, insurers and buyers ask for.

40+ Years Experience

Hands-on remedial and heritage work across Sydney since the 1970s, including jobs other builders turned down.

What our clients say

Rated 5.0 by Sydney clients.

5.0

Real reviews from homeowners, strata and builders.

My partner and I own an original 1920s semi-detached home in Vaucluse, with complex sandstone foundations and multiple structural challenges caused by previous defective works. After years of delays, failed consultants, and no progress, I met Constatine and his team. From the beginning, I was impressed by the detailed review of our plans and the identification of numerous discrepancies that previous builders had missed. The team supported us through lengthy council negotiations, neighbour consultations, and COVID-related delays, even before contracts were signed. Once construction commenced, Constatine and the Meteora Constructions team were exceptional. Progress remained on schedule despite heavy rain, unforeseen structural issues, and highly complex underpinning works that previous builders had refused to undertake. They completed the work efficiently and at significantly less cost than other builders had quoted. I cannot speak highly enough of Constatine and METCON Remedial Services. It is no understatement to say that engaging Constatine and his team saved not only our project, but probably our marriage as well.
SBSteven Brown Vaucluse
We have been undertaking a considerable repair and restoration of our 1850 residence in Darlinghurst. Constatine and his team completed outstanding work, all at a very competitive price. Every deadline was met with no increase to the original quote. Their knowledge, gathered over many years, and their incredible eye for detail significantly improved the final outcome beyond what was originally proposed. I rate them very highly and would recommend them wholeheartedly.
NDNicholas Davie Darlinghurst
I couldn't be more pleased that I found Constatine and his team to assist our strata building with landscaping, waterproofing, and concrete cancer repairs. He was knowledgeable, reliable, patient, and deeply committed to achieving the best result for everyone involved. I am 100% confident that the work completed will stand the test of time. He will absolutely be my go-to moving forward, and I have no doubt we will work together again.
JJodi Cremorne
Government & Public Buildings FAQ

Common questions.

Straight answers from the builder. Anything else, just ask.

Do you work with councils and government agencies?

Yes. We price remedial works for public buildings to the client's specification or schedule of works, and follow their procurement, site and reporting rules.

Can you price from our condition audit?

Yes. Send the audit or engineer's scope and we will price it line by line, and tell you which items need investigation before they can be priced properly.

Does remedial work on public housing need a DBP registered builder?

Most public and community housing apartment buildings are Class 2, so remedial work on them generally needs a registered building practitioner, unless an exemption applies. METCON holds DBP General Unrestricted registration, BUP4254812.

How do you keep the public safe?

With hoardings, overhead protection, managed pedestrian routes and permits for work on public land, planned before the work starts and checked every day.

What records do we get at the end?

Photos of repairs before they are covered, test results, product records, warranties and as-built mark-ups, ready for your asset records.

More remedial services

Other remedial services.

Remedial problems rarely come alone. Leaks cause concrete cancer, damp causes render failure. We fix the whole chain.

Back to Remedial Building
Helpful guides

Know more before you start.

Plain-language guides from our team on the questions we are asked most.

Where we work

Public building remedial works across Sydney.

Council, state and community buildings across Sydney and NSW.

Let's get started

Got a public building that needs repairs?

Send us the condition audit, scope or photos and we will come back with a clear, itemised price and how the work can be staged.

Phone, direct to the builder0415 840 500 Email plans or photosinfo@meteoraconstructions.com.au
Open 7 days7am to 7pm, reply within 1 business day
Service areaSydney and surrounding NSW
Call now Free Quote