The National Construction Code sorts buildings into classes by how they are used. The class decides the fire, access, structural and other requirements, and in NSW it also decides whether remedial work falls under the Design and Building Practitioners Act. Many buildings contain more than one class.
The classes
- Class 1a. Houses, terraces, townhouses and villas, including many strata townhouse complexes.
- Class 1b. Small boarding houses, guest houses and hostels.
- Class 2. Apartment buildings, with two or more separate homes. See what is a Class 2 building.
- Class 3. Residential buildings for unrelated people or short stays, such as hotels, motels, backpackers and larger boarding houses. See Class 3 buildings explained.
- Class 4. A single home within a non-residential building, such as a caretaker's flat.
- Class 5. Offices.
- Class 6. Shops, restaurants, cafes and other retail.
- Class 7a. Car parks. Class 7b. Warehouses and storage.
- Class 8. Factories, workshops and laboratories.
- Class 9a. Health-care buildings, such as hospitals and day surgeries.
- Class 9b. Assembly buildings, such as schools, churches, halls, theatres and sports venues.
- Class 9c. Residential care buildings, such as aged care homes.
- Class 10. Non-habitable structures, such as garages, sheds, fences, retaining walls and pools.
Mixed-use buildings
A typical Sydney mixed-use building might have a Class 7a basement car park, Class 6 shops on the ground floor and Class 2 apartments above. Each part follows its own rules, and work that crosses parts must satisfy both. See mixed-use building leaks.
Why the class matters for repairs
- DBP Act. In NSW, remedial work on Class 2 buildings is generally regulated. For Class 3 and 9c buildings the position is different and has been changing, so check the current rules.
- Occupied buildings. Hospitals, aged care and schools need repairs planned around vulnerable people.
- Fire safety. Different classes have different fire separation and egress needs, which repairs must not compromise.
How to find your building's class
Check the building's development consent, construction certificate or occupation certificate, or ask a certifier. Then see our pages for Class 2 builders, hospitals and healthcare and government and public buildings.
Call 0415 840 500 or book an inspection. METCON is a licensed NSW builder (384697C) and DBP registered (BUP4254812).
General information only. Confirm current requirements with your certifier, engineer, strata manager or lawyer.
Frequently asked questions
Can a building change class?
Yes, through a change of use, which needs approval and may require upgrades.
Is a strata townhouse complex Class 2?
Often not. Townhouses side by side are usually Class 1a, even if they are under a strata scheme.
Which class is a hospital?
Hospitals are generally Class 9a. Aged care homes are generally Class 9c.