Remedial work on most apartment buildings in NSW has to be carried out by a registered building practitioner under the Design and Building Practitioners Act. Before your committee signs anything, check the registration yourself. It takes a few minutes and avoids a serious problem later.
Where to check
Use the NSW Government licence and registration check online. Search by the person's or company's name, or by the registration number. The record shows the registration, its class, its status, any conditions and the expiry date.
What to look at
- The name. Does it match the company on the quote and contract exactly? A related company with a similar name is not the same thing.
- The status. It should be current, not suspended, cancelled or expired.
- The class. Building practitioner registration has different classes, and some are limited by the size or height of the building. Make sure the class covers your building.
- Conditions. Read them. A condition can limit the work the practitioner can do.
- The nominee. A company is registered through a nominated individual. Ask who that is and whether they will be involved in your job.
Check the licence too
DBP registration is separate from a contractor licence. A builder doing residential building work in NSW also needs the right contractor licence. Check that on the same service and compare names again.
Other checks worth doing
- Ask for insurance certificates, including public liability and workers compensation.
- Ask for a similar project the builder has done, with photos of the work before it was covered.
- Ask who will prepare the building compliance declaration at the end.
- Ask how they work with your engineer if the design needs to change on site.
Our details
METCON holds builder licence 384697C and DBP General Unrestricted registration BUP4254812. Check them on the public register. Read what is a Class 2 builder, the remedial builder checklist for strata managing agents and our Class 2 builder page.
Call 0415 840 500 or book an inspection. METCON is a licensed NSW builder (384697C) and DBP registered (BUP4254812).
General information only. Confirm current requirements with your certifier, engineer, strata manager or lawyer.
Frequently asked questions
Is a licence enough for Class 2 remedial work?
Not for regulated work. The builder also needs DBP building practitioner registration.
Can a subcontractor hold the registration instead?
The registered building practitioner is the one who agrees to do the building work and makes the declaration. Ask who that is in your contract.
What if the registration lapses during the job?
Raise it immediately with your strata manager and lawyer. Do not ignore it.