A Class 2 building is an apartment building: a building with two or more sole-occupancy units, each a separate home. Walk-ups, towers and the apartment levels of mixed-use buildings are all Class 2. Because people live above, below and beside each other, the rules are stricter than for a house.
What the Building Code covers
The National Construction Code sets performance requirements for Class 2 buildings in areas such as:
- Fire resistance and separation. Walls and floors between units, stairs and corridors must resist fire for set periods, depending on the type of construction and the number of storeys.
- Egress. Safe paths to exits, fire stairs and doors that work in an emergency.
- Fire safety systems. Smoke detection, emergency lighting, sprinklers and hydrants where required.
- Sound insulation. Floors and walls between units must limit airborne and impact noise.
- Weatherproofing and wet areas. External walls, roofs, balconies and bathrooms must keep water out of the building.
- Structure. The building must carry its loads safely for its life.
The DBP Act on top
Since July 2021, most building work on Class 2 buildings in NSW, including remedial work, is regulated by the Design and Building Practitioners Act 2020. In practice this means a regulated design prepared by a registered design practitioner, work carried out by a registered building practitioner, and compliance declarations lodged on the NSW Planning Portal. Some work is exempt, such as certain emergency repairs. See the DBP Act explained.
Fire safety statements every year
Buildings with essential fire safety measures need an annual fire safety statement, and Class 2 buildings commonly have them. Remedial work can affect those measures. Cutting through a fire-rated slab for new drainage or removing a fire-rated ceiling to repair concrete must be planned so the rating is restored and recorded. See fire stopping penetrations.
Does a repair have to bring the whole building up to today's code?
Usually not automatically. New work should comply with the current code as it applies to that work. Whether other parts of an old building must be upgraded depends on the approval pathway, the certifier and any orders. That is why remedial scopes sometimes include upgrades such as balustrade heights. Read existing non-compliance in Class 2 remedial work.
What this means for your project
- Confirm the building's classification from its approvals. Mixed-use buildings can have several classes.
- Ask your engineer whether the work is regulated under the DBP Act.
- Check that your builder is registered for the building's size.
- Keep the designs, declarations, photos and test results with the strata records.
Start with what is a Class 2 building and our Class 2 builder page.
Call 0415 840 500 or book an inspection. METCON is a licensed NSW builder (384697C) and DBP registered (BUP4254812).
General information only. Confirm current requirements with your certifier, engineer, strata manager or lawyer.
Frequently asked questions
Is a townhouse complex Class 2?
Usually not. Townhouses side by side on their own land are often Class 1a, even under strata. Check the approvals.
Is a building with shops below still Class 2?
The apartment part is Class 2. The shops are a different class, and the rules for each part apply.
Does every repair need a regulated design?
Not every repair. Regulated work generally does. Your engineer or certifier should confirm.