Old Balcony Doors and Balustrades During Class 2 Waterproofing

25 November 2026 · 4 min read · By the METCON team

A common argument starts when the new membrane reaches an old sliding door or balustrade. Owners worry that repairing one balcony means upgrading everything around it. NSW guidance gives more useful examples.

If the door can stay

Where an existing door is not compliant but there is no safety issue, NSW says it may remain if compliant waterproofing can be designed without interfering with it. If the compliant waterproofing must interfere with the door, the door must be upgraded to comply.

If the balustrade can stay

A non-compliant balustrade with a safety issue does not automatically have to be replaced during waterproofing if the membrane can comply without interfering. However, NSW says the problem should be documented in the design and referred to the owner for rectification. If the waterproofing must interfere with it, it must be upgraded.

Do not wait until tiles are off

Open a typical door edge, post fixing and drain while designing. Measure threshold and upstand heights. That evidence shows whether a compliant junction can be built.

Make the boundary visible

The design should use drawings, sections or marked photographs to distinguish existing parts from new work. Notes must tell the builder where one scope stops.

Safety cannot be parked

A loose barrier, falling concrete or dangerous threshold needs prompt advice and controls, even if it is priced separately.

Budget for two options

  1. Existing door and barrier remain, with a verified junction.
  2. They change, including structure, access and finishes.

This helps owners decide before scaffold is paid for.

Read balcony doors, balustrade height and balcony repairs.

Call 0415 840 500 or book an inspection. METCON is a licensed NSW builder (384697C) and DBP registered (BUP4254812).

General information only. Confirm current requirements with your certifier, accredited practitioner or lawyer.

Frequently asked questions

Do all old balustrades need replacing?

Not automatically. Safety, interference and the actual design must be assessed.

Can a new membrane finish below an old door?

Only if the complete compliant junction can be designed and built.

Who records the remaining issue?

The design should identify it, and practitioners should advise the owner.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Council Approvals
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote