The Design and Building Practitioners scheme already covers remedial work on Class 2 buildings unless an exclusion or emergency pathway applies. For Class 3 buildings, which include hotels, the NSW Government states that remedial work is excluded from regulation under the scheme until July 2028.
What that does not mean
It does not remove the need for sound design, approvals, licensed work or compliance. The duty of care under the DBP Act is a separate issue, and legal commentary notes the deferral does not affect it. Other planning and fire safety duties also continue.
Watch mixed-use buildings
If the building also has a Class 2 part, the current rules may already matter. A hotel with apartments above is not the same as a standalone hotel. Confirm which parts the work affects.
Use the time before 2028
- Investigate roofs, facades, structure and wet areas.
- Put major works into a sensible program.
- Improve as-built and maintenance records.
- Use declared or engineer-led designs where the risk warrants it, even if not yet mandatory.
- Ask contractors what registrations they hold.
Do not rush work only to beat a date
A poorly investigated membrane or facade repair can cost more than a well documented project completed later.
What may apply after the change
For Class 2 remedial work today, the process includes regulated designs from registered design practitioners, declarations and lodgement by a building practitioner. Hotels should follow the final 2028 requirements rather than assume every step will be identical.
Check again before signing
Dates have moved before, and wider NSW building law reform is under way. Read Class 3 buildings, regulated designs and law changes.
Call 0415 840 500 or book an inspection. METCON is a licensed NSW builder (384697C) and DBP registered (BUP4254812).
General information only. Confirm current requirements with your certifier, accredited practitioner or lawyer.
Frequently asked questions
Does the DBP scheme cover hotel remedial work now?
NSW states Class 3 remedial work is excluded until July 2028. Check mixed-use parts and current law.
Does it cover new hotels?
New building work can have different rules from remedial work. Ask your certifier.
Can a DBP registered builder do hotel work now?
Yes. Registration can be held before it becomes mandatory for a type of work.