Regulated Designs and CIRDs for Strata Remedial Work in NSW

25 November 2026 · 4 min read · By the METCON team

CIRD stands for Construction Issued Regulated Design. For Class 2 remedial work that is regulated and not an emergency, NSW guidance says a registered design practitioner prepares it and a building practitioner lodges it on the NSW Planning Portal.

What work can be caught

The scheme covers defined building elements, including waterproofing, structure, enclosure and fire safety systems. Some work is excluded. Exempt development is not always outside the scheme, so ask about the actual scope.

What the design should show

  • Where the work is on the building.
  • Drawings at a useful scale.
  • Sections, details and specifications.
  • Materials and products.
  • Performance requirements.
  • What is existing and what is new.

NSW also suggests elevations, sections, marked photos or sketches that place the work in context.

Why "repair as required" is weak

A builder cannot consistently price or construct an unknown detail. A balcony design should show the membrane edges, outlet, door and balustrade junctions, not only the open floor.

Who prepares it?

The practitioner needs the correct class and scope of authority. One remedial project can need more than one, for example where structure, facade and waterproofing meet.

Before work starts

  1. Confirm whether the work is regulated.
  2. Check practitioners on the public register.
  3. Complete investigation and design.
  4. Lodge designs and design declarations as required.
  5. Resolve variations before building them.

Keep the owner's copy

Store the issued set, declarations and final changes with inspections and product records. Those files help with future repairs.

See design declarations, existing defects and Class 2 builder.

Call 0415 840 500 or book an inspection. METCON is a licensed NSW builder (384697C) and DBP registered (BUP4254812).

General information only. Confirm current requirements with your certifier, accredited practitioner or lawyer.

Frequently asked questions

Does every strata repair need a CIRD?

No. Work can be excluded or follow an emergency pathway. Get project-specific advice.

Can the builder draw it?

A regulated design must be prepared and declared by a suitably registered design practitioner.

Can work start while the CIRD is being lodged?

Required designs and declarations must be lodged before related work starts, unless a lawful exception applies.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Council Approvals
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote