A design compliance declaration, often called a DCD, is made by a registered design practitioner for a regulated design. Owners see the abbreviation in a quote or file without knowing what it proves.
What it is for
The declaration records the practitioner's position on the design and relevant requirements. It belongs to the identified design, not to every item in the building.
What it does not replace
- Inspection of construction.
- The builder's own declaration.
- Product warranties.
- Engineering for a design outside its scope.
- Investigation before repair.
A good form cannot rescue an unclear drawing.
Check six things
- The practitioner is registered in a suitable class.
- The project and building are correct.
- The drawing numbers and revisions match.
- The declared work matches the contract.
- Conditions or performance solutions are understood.
- The current version has been lodged as required.
Variations matter
If a variation involves a building element or performance solution, NSW guidance calls for a new or updated regulated design and a new declaration. Do not build the new detail while treating the old drawing as close enough.
A simple owner question
Ask the project team: "Which current declared design covers this exact membrane edge, wall or beam?" The answer should be a document and drawing reference.
Keep the chain
Save superseded and current drawings, declarations, approved variations, construction photos and final records. Removing the old set from working files avoids mistakes, but do not lose its history.
Read CIRDs, builder declarations and choosing a Class 2 builder.
Call 0415 840 500 or book an inspection. METCON is a licensed NSW builder (384697C) and DBP registered (BUP4254812).
General information only. Confirm current requirements with your certifier, accredited practitioner or lawyer.
Frequently asked questions
Is a DCD the same as a waterproofing certificate?
No. They cover different stages and responsibilities.
Can owners sign a DCD?
It must be made by the relevant registered design practitioner.
Does one declaration cover the entire project?
Not necessarily. Several designs and practitioners can be involved.