Building Compliance Declarations for Class 2 Remedial Work

25 November 2026 · 4 min read · By the METCON team

A building compliance declaration is made by the building practitioner. NSW guidance says only that practitioner can lodge it and the task cannot be delegated.

Why remedial owners should ask

A project may be planned as repairs, with no occupation certificate expected. NSW guidance states that a declaration is still needed for work under the scheme where an occupation certificate is not required.

What should match

  • The contract and building practitioner.
  • The current regulated designs.
  • Any approved variations.
  • The work actually constructed.
  • Required inspections and records.
  • As-built information.

If a balcony detail changed on site, a declaration file that contains only the original drawing is incomplete.

Ask early, not at final payment

Put the records into the progress program. Waterproofing photos must be taken before tiles and structural photos before concrete. Nobody can recreate them in the last week.

A useful handover list

  1. Declaration and lodgement confirmation.
  2. Final designs and variations.
  3. Inspection and test results.
  4. Product and warranty information.
  5. Location photos.
  6. Maintenance instructions.
  7. Outstanding items and who owns them.

Emergency work is different, but not paperwork-free

For qualifying emergency work, the normal designs may not be needed before work. NSW guidance says the builder still completes a building compliance declaration and must tell owners if the temporary work does not comply.

Payment

Contract payment rules and statutory obligations are separate. Ask for legal advice before withholding money.

See practical completion, emergency work and Class 2 builder.

Call 0415 840 500 or book an inspection. METCON is a licensed NSW builder (384697C) and DBP registered (BUP4254812).

General information only. Confirm current requirements with your certifier, accredited practitioner or lawyer.

Frequently asked questions

Can the project manager lodge it?

NSW says only the building practitioner can make the declaration, and it cannot be delegated.

Is it the same as an occupation certificate?

No. They are different documents and responsibilities.

Do small repairs need one?

It depends on whether the work is regulated or excluded. Confirm before starting.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Council Approvals
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote