Many apartment car parks and balcony soffits have white crusts, streaks or small icicle-like stalactites hanging from cracks in the concrete. They can look harmless, but they tell you something important: water is passing right through the slab.
What the white material is
As water moves through concrete, it dissolves lime and other minerals. When the water reaches the underside and evaporates, those minerals are left behind and react with the air, forming a white crust. Over time, steady drips build up small stalactites. The same process causes white staining on brickwork, known as efflorescence. See efflorescence on brick and concrete.
Why it matters
- There is a leak above. Water is getting through a failed membrane, a crack, a joint or a penetration in the slab above.
- The concrete is being leached. Long-term leaching can weaken the concrete around the crack.
- Steel is at risk. Water passing through cracks reaches the reinforcement, so rust stains near the white deposits are a warning sign of concrete cancer.
- Cars and people get damaged. Drips mark car paint and make floors slippery.
Where it usually comes from
- Podiums, courtyards and garden beds above a car park.
- Balconies and walkways above, with failed membranes.
- Construction joints, cracks and expansion joints in the slab.
- Planter boxes and pools.
- Pipe penetrations through the slab.
How it is fixed
Scraping the deposits off does nothing on its own. The water source above has to be found and stopped. Depending on the cause, that can mean replacing a membrane, repairing joints, sealing penetrations or injecting cracks from below. See crack injection for leaking concrete and podium membrane replacement.
Once the water has stopped, any concrete cancer is repaired and the soffit cleaned and, if specified, coated.
What to record now
- Photograph the deposits and mark their locations on a car park plan.
- Note whether drips increase after rain or after irrigation.
- Look for rust staining beside the white marks.
- Report it to the strata manager.
Read water ingress investigation in apartment buildings, then see our waterproofing page.
Call 0415 840 500 or book an inspection. METCON is a licensed NSW builder (384697C) and DBP registered (BUP4254812).
Frequently asked questions
Are concrete stalactites dangerous?
The deposits are not, but the leak behind them can damage the concrete and steel over time.
Can we just paint over the white marks?
Paint will not stop the leak, and the deposits will come back through it.
Does it mean the slab is failing?
Not necessarily, but it should be inspected, especially if there are rust stains or cracking.