Many Sydney towers and mid-rise buildings from the 1960s onwards have facades made of precast concrete panels, cast in a factory and fixed to the frame on site. They look solid and they last well, but they have weak points that need regular attention.
The joints
Panels are separated by joints filled with sealant. Sealants harden and split over time, and when they fail, water runs behind the panels and into the building. Joint sealant replacement is one of the most common facade maintenance jobs on precast buildings. See failed sealants and expansion joints.
The fixings
Each panel is held by a small number of steel fixings, connecting it to the slab or frame. They are usually hidden. If water reaches them for years, they can corrode. Corroded fixings are a serious safety issue because a panel relies on them entirely. An engineer may recommend opening up selected panels to inspect fixings, especially where joints have failed for a long time.
Cracking and spalling
Like any reinforced concrete, panels get concrete cancer where cover is thin, often at edges, corners and around fixings. Some panels also crack from restrained movement where joints have been filled with hard material.
Finishes
Exposed aggregate, painted and textured finishes all age. Repairs need to match the finish so the facade does not look patched. Trial repairs help choose the right mix. See trial repairs.
How a precast facade project usually runs
- Visual and close inspection by rope access or swing stage.
- Opening up selected panels to check fixings.
- Engineer's report on fixings, concrete and joints.
- Repairs to fixings where needed, concrete repairs and joint replacement.
- Protective coating if specified.
Access
Tall flat precast facades often suit swing stages or rope access rather than full scaffold. Read rope access vs scaffold vs swing stage and see our facade repairs page.
Call 0415 840 500 or book an inspection. METCON is a licensed NSW builder (384697C) and DBP registered (BUP4254812).
Frequently asked questions
Can you tell if fixings are corroded from outside?
Not reliably. Rust staining at joints is a warning sign, but opening up is usually needed.
Can a whole panel be replaced?
It is possible but rare and complex. Most panels are repaired in place.
How often should joints be replaced?
Sealants age with sun and movement. Inspect them as part of a regular facade program.