Open Car Park Deck Membranes on Apartment Buildings

27 November 2026 · 4 min read · By the METCON team

Many apartment buildings have an open car park deck: the top level of a car park exposed to the weather, sometimes with units or shops below. It is both a roof and a road. Rain, salt from cars, sun and the grinding of tyres all work on the concrete at once.

What goes wrong

  • No membrane. Many decks were built as bare concrete. Water soaks in and reaches the steel.
  • Cracks and joints. Shrinkage cracks, construction joints and expansion joints let water through to the level below. See car park expansion joint repairs.
  • Worn coatings. Thin coatings wear through on ramps, turning circles and entry points.
  • Ponding. Low spots hold water and dirt.
  • Concrete cancer. Salt and water reach the reinforcement, especially where cover is thin.

Trafficable membranes

Trafficable membranes are systems designed to carry vehicles. They usually include a primer, a flexible waterproof layer, a wearing layer with grit for grip and a UV-resistant top coat. Heavier systems are used on ramps and turning areas. The choice depends on traffic, exposure, the slab's condition and the space below.

How the work is done

  1. Repair concrete cancer and cracks first.
  2. Grind or blast the surface to prepare it.
  3. Detail joints, drains, upstands and columns.
  4. Apply the membrane system in the right thicknesses.
  5. Reinstate line marking and signage.

Staging around cars

Decks are usually done in zones so most parking stays available. Each zone needs time to cure before cars return, which depends on the product and weather. Residents need notice, and temporary parking may need arranging. Plan for weather days, because most systems cannot be applied to a wet slab.

Look after it

Regular cleaning of drains, repairs to damaged areas and a re-coat of the wearing layer at intervals keep the system working. Read carpark concrete repairs and balcony coatings and trafficable membranes, then see waterproofing.

Call 0415 840 500 or book an inspection. METCON is a licensed NSW builder (384697C) and DBP registered (BUP4254812).

Frequently asked questions

Can we just seal the concrete?

A sealer can reduce water entry on some decks, but it does not bridge cracks the way a membrane does.

How long does the car park need to close?

Zones usually close for days, not weeks. It depends on the system and the weather.

Does the membrane go over concrete cancer?

No. Concrete cancer must be repaired first, or it will keep spalling under the membrane.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Structural Remediation
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote