Before a building commits to repairing every balcony, every slab edge or a whole facade, it often pays to do one area first. A trial repair, sometimes called a sample area or mock-up, turns assumptions into facts.
What a trial shows
- The real cause. Is the leak through the membrane, the door, the outlet or the wall?
- The real condition. How deep is the concrete damage? Is the steel salvageable?
- Whether the method works. Does the specified product bond to this substrate? Does the new detail drain?
- The real time and cost. How long does one balcony take? What does a typical repair really involve?
- The finished look. Does the new render, colour or tile match the rest of the building?
How to pick the trial area
Choose an area that represents the problem, not the best or the worst. A balcony on the most exposed elevation, or a bay of the car park with typical damage, gives useful results. Make sure access is practical and the owner of the unit agrees.
How it fits the program
- Investigation and engineer's preliminary design.
- Trial repair to that design, with hold-point inspections and records.
- Review the results with the engineer and committee.
- Adjust the design and scope.
- Tender or price the full program with better information.
Costs and benefits
A trial costs money and adds time at the start. It usually saves both later. Variations on a building-wide program can be far larger than the cost of a trial, and a method that fails after the scaffold is down is the most expensive outcome of all.
When it is less useful
For small, simple repairs where the cause is obvious, a trial may add little. For complex buildings, new products, heritage fabric or repeated past failures, it is usually worth it.
Read hidden damage found during strata remedial works, strata remedial estimate vs tender price and see our strata remedial page.
Call 0415 840 500 or book an inspection. METCON is a licensed NSW builder (384697C) and DBP registered (BUP4254812).
Frequently asked questions
Does the trial builder have to do the whole job?
Not necessarily. The trial can be done separately, then the full program tendered.
Can a trial be done on a balcony people use?
Yes, with the owner's agreement and a short closure.
Who decides if the trial worked?
The engineer reviews the results with the committee.


