How Often Should an Apartment Facade Be Inspected?

27 November 2026 · 4 min read · By the METCON team

Facades are hard to see properly. From the ground, cracked render on level eight or a failing sealant on a high joint looks like nothing. By the time it is obvious, a piece may already have fallen. Regular inspection is the only way to stay ahead of it.

Is there a legal interval?

There may be no fixed legal interval for your building. That does not reduce the owners corporation's duty to maintain common property, or the risk if something falls. Many committees set an inspection interval in their capital works plan and stick to it.

A sensible pattern

  • Every year. A visual check from the ground, balconies and roof by the building manager or maintenance contractor. Photograph anything new.
  • Every three to five years. A closer inspection by a facade consultant, engineer or experienced remedial builder, using binoculars, drones, rope access or elevated platforms where needed.
  • After major events. Storms, earthquakes, nearby excavation or a piece of material falling.
  • More often for higher risk. Coastal buildings, older concrete buildings and buildings with known defects.

What a facade inspection covers

  • Render cracking and drummy areas.
  • Concrete cancer at slab edges, hoods, sills and columns.
  • Brickwork cracking, lintels and movement joints.
  • Sealant joints around windows and panels.
  • Balcony edges and balustrade fixings.
  • Fixings for signage, screens, awnings and plant.

Drones and close inspection

Drones are a fast way to photograph a facade and spot obvious problems. They cannot sound render to find drummy areas or check fixings. Close inspection of selected areas is still needed.

From inspection to action

Findings should be rated by urgency and fed into the capital works plan. Urgent safety items, such as loose render over a footpath, need immediate action. Read strata building health check, drummy render on apartment buildings and loose facade tiles. See our facade repairs page.

Call 0415 840 500 or book an inspection. METCON is a licensed NSW builder (384697C) and DBP registered (BUP4254812).

Frequently asked questions

Can the building manager do the inspection?

They can do regular visual checks. A closer inspection should be done by a qualified consultant or engineer.

Are drone inspections enough?

They are a good start, but not a substitute for sounding and close inspection where risk is high.

What if something falls?

Cordon off the area, make it safe and get an urgent inspection of the whole elevation.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Strata Remedial Works
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote