A building health check is a planned look at the whole building, usually by a building consultant, engineer or experienced remedial builder. It is not a defect claim report. Its job is to tell the committee what condition the building is in and what needs attention, so money can be planned.
What should be inspected
- Roofs, gutters and parapets. Membranes, sheeting, flashings, box gutters, downpipes and plant penetrations.
- Facades. Render, brickwork, concrete, sealants, lintels and movement joints.
- Balconies. Tiles, membranes, falls, outlets, balustrades and slab edges.
- Concrete. Signs of concrete cancer on slab edges, soffits, columns and car parks.
- Windows and doors. Frames, seals, sills and drainage.
- Car parks and basements. Leaks, drainage, pump-out pits and ramps.
- Grounds. Retaining walls, paving, stormwater and boundary walls.
Fire safety systems, lifts and plumbing need their own specialists. A good health check says where those specialists should look next.
How the findings should be presented
Each item should have a location, a photo, a description, a likely cause and an urgency rating. A simple scale works best: make safe now, repair within a year, plan within five years, monitor. The report should also say what could not be seen, such as roofs without safe access or concrete behind tiles.
From health check to capital works plan
The urgency ratings feed straight into the 10-year capital works fund plan. Items that share access, such as balconies and facade repairs on the same elevation, can be grouped under one scaffold. See one scaffold, many fixes.
How often
Many committees repeat a health check every three to five years, and after major storms or when the building passes a milestone age. Newer buildings benefit from one before warranty periods run out. Read strata defect report before warranty expires.
What happens next
If the check finds serious problems, the next step is usually an engineer's investigation and a remedial scope of works. Talk to us about strata remedial works.
Call 0415 840 500 or book an inspection. METCON is a licensed NSW builder (384697C) and DBP registered (BUP4254812).
Frequently asked questions
Is a health check the same as a building condition report?
They are similar. Different consultants use different names. Ask what will be inspected and how it will be rated.
Does a health check include testing?
Usually only visual checks and simple tests. Concrete or leak testing is normally a separate step.
Who should commission it?
The owners corporation, usually through the strata manager, so the report belongs to the scheme.