Cars and trucks hit columns, walls and beams in basement car parks all the time. Most damage is a chipped corner. Some is not. A column is part of the structure that holds the building up, so damage should never be ignored.
First steps after an impact
- Check for obvious danger. Large cracks, exposed or bent steel, or concrete falling are reasons to cordon off the area.
- Photograph everything. The damage, the vehicle and the location, with the date and time.
- Tell the strata manager or building manager. They should record it and decide on next steps.
- Get it assessed. For anything beyond minor surface damage, ask a structural engineer to inspect.

What the engineer looks for
- Depth and extent of cracking.
- Whether reinforcement is exposed, bent or broken.
- Whether the column has moved or lost section.
- Older damage and concrete cancer around the impact.
How it is repaired
Minor damage is cleaned back and patched with a repair mortar. More serious damage follows a structural repair method: loose concrete removed, steel cleaned or replaced to the engineer's design, and the section rebuilt with formwork. Severe damage may need propping before the column is repaired. See structural concrete repair to columns and beams.
Protect it afterwards
Corner guards, column wraps, kerbs and wheel stops reduce repeat damage. Better line marking, mirrors and lighting at tight turns help too. Bright protection on the most hit columns is cheap compared with repeat structural repairs.
Who pays
If the driver is known, their insurer may cover the repair. If not, it is usually an owners corporation repair, which may be claimable under the strata building policy depending on the policy terms. Keep the photos and reports. See strata insurance or levy.
Look for the bigger picture
Impacts often reveal existing concrete cancer from water and salt in the car park. Read carpark concrete repairs and see structural remediation.
Call 0415 840 500 or book an inspection. METCON is a licensed NSW builder (384697C) and DBP registered (BUP4254812).
Frequently asked questions
Is a chipped column corner a problem?
Often it is cosmetic, but if steel is exposed or cracks run into the column, get it assessed.
Can we keep using the car space?
If the engineer is satisfied there is no risk. For serious damage, the area may need to be closed or propped.
Who should repair it?
A builder experienced in structural concrete repair, working to the engineer's method.