Every facade repair starts with the same question: how do we safely reach the wall? On a multi-storey building, the access method shapes the price, the program and what work can be done.
Scaffold
Full scaffold gives a stable working platform at every level. It suits heavy work such as concrete cancer repairs, render replacement, window replacement and balcony works across a whole elevation. Materials and waste can move easily, and several trades can work at once.
Downsides: it takes time to erect, needs permits if it is over a footpath, affects light and privacy for residents, and can create a security risk. See security during scaffolding.

Swing stages
A suspended platform hangs from the roof and moves up and down a drop. It suits tall, flat facades and lighter repetitive work such as sealant replacement, coatings and some concrete repairs.
Downsides: it needs suitable roof anchors or counterweights, it covers one drop at a time, and wind limits working days.
Rope access
Technicians work from ropes anchored at roof level. It is quick to set up and suits inspections, small repairs, sealants, cleaning and access to awkward areas.
Downsides: it is slower for heavy work, there is limited room for materials and tools, and some repairs need more stable support than a rope can give.
Elevated work platforms
Boom lifts and scissor lifts suit low and mid-rise buildings with good ground access, such as walkways and courtyards.
How to choose
- What is the work? Heavy break-out needs a stable platform.
- How much of the facade is affected?
- What is below: footpath, driveway, garden, neighbour?
- Does the roof have certified anchors? See roof anchors and height safety.
- How long will the work take?
Combine methods
Many projects use rope access to inspect and map defects first, then scaffold or swing stages to repair. This gives the committee better numbers before the big access cost is committed. Read facade remediation project stages and see our facade repairs page.
Call 0415 840 500 or book an inspection. METCON is a licensed NSW builder (384697C) and DBP registered (BUP4254812).
Frequently asked questions
Is rope access cheaper?
Often for small or scattered repairs. For large areas of heavy work, scaffold can work out better.
Do we need council approval for scaffold?
If it is on public land such as a footpath, usually yes. See our guide to permits.
Can residents use their balconies with scaffold up?
Sometimes, with restrictions. It depends on the work and safety controls.