Security During Scaffolding on Apartment Buildings

27 November 2026 · 4 min read · By the METCON team

Scaffold around an apartment building makes upper levels reachable from the street. Residents are right to worry about security, and a good remedial program plans for it from day one.

What the builder should do

  • Block the lower lifts. Ladder access and the first levels should be closed off with locked gates or removed ladders outside working hours.
  • Fence and sign the base. Site fencing and hoardings stop casual access at ground level.
  • Lighting. Lights on the scaffold and at the base help deter people at night.
  • Alarms or monitoring. On larger projects, scaffold alarms or camera monitoring may be worth the cost.
  • Daily checks. The site should be checked and locked at the end of every shift.
  • Worker identification. Residents should know who is meant to be on the scaffold and how to recognise them.

What residents can do

  1. Keep windows and balcony doors locked when not at home, even on upper floors.
  2. Fit or check window locks and door locks before scaffold goes up.
  3. Move valuables away from windows.
  4. Report anyone on the scaffold outside working hours.
  5. Tell the building manager if you will be away.

Privacy

Scaffold puts workers outside bedrooms and living areas. Shade cloth, notice before work outside particular units, and respectful workers make a big difference. See living in a building during remedial works.

Insurance

Ask how the builder's insurance and the strata policy deal with break-ins during the works, and remind residents that contents insurance is their own.

Keep the scaffold up for less time

The best security measure is a shorter program. Grouping all the facade and balcony work under one access setup, and planning materials so work is not held up, keeps scaffold time down. See one scaffold, many fixes and our strata remedial page.

Call 0415 840 500 or book an inspection. METCON is a licensed NSW builder (384697C) and DBP registered (BUP4254812).

Frequently asked questions

Who is responsible for security during the works?

The builder controls the site, but residents still need to lock their own windows and doors.

Can scaffold come down between stages?

Sometimes, if stages are far apart. It costs more to erect twice, so it is a trade-off.

Should we tell our insurer?

Your strata manager should tell the building insurer about major works. Residents can check their own contents policy.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Strata Remedial Works
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote