Replacing the Membrane Under a Landscaped Podium

24 November 2026 · 4 min read · By the METCON team

A landscaped podium often sits over a car park or shops. When its membrane fails, the leak below may be a long way from the hole above. Water can travel across the slab before it finds a crack.

First decide whether patching is realistic

One failed pipe penetration may suit a local repair. Leaks in several areas, brittle membrane and poor falls point to a wider replacement. Opening trial areas gives the committee better evidence than guessing from the ceiling below.

What must come off

Plants, soil, paving, drainage cell and protection layers may all have to be removed. A landscape survey should record what is kept, what is replaced and where heavy material can be stored. Stockpiling soil on one part of a slab can overload it.

The order of work

  1. Protect the space below and plan escape routes.
  2. Strip one zone and repair the slab.
  3. Correct falls and outlets where possible.
  4. Prepare upstands, joints and penetrations.
  5. Install the specified membrane and test it.
  6. Protect it before drainage, soil and paving go back.

Where budgets move

Hidden concrete damage, drains below the finished level, planter walls and tree removal are common unknowns. Put rates or allowances in the contract and agree who approves them. See variations and provisional sums.

Plan for next time

Inspection points, root barriers and accessible outlets make later maintenance easier. Keep a plan of the hidden drainage. If soil depth or finishes are changing, ask the engineer to check loads before the new design is approved.

For related work, see waterproofing and podium waterproofing.

Call 0415 840 500 or book an inspection. METCON is a licensed NSW builder (384697C) and DBP registered (BUP4254812).

Frequently asked questions

Can the podium stay open?

Often in stages, but the working zone and the area below may need closing. Fire exits must stay available.

Must every tree be removed?

Not always. Root depth, membrane access and tree health need assessment.

How is a new membrane tested?

The specification may call for flood or electronic testing. The method must suit the slab and membrane.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Strata Remedial Works
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote