Strata management companies often look after dozens or hundreds of buildings, many of them ageing. Leaks, concrete cancer and failing balconies land on the desk one at a time, but the patterns are portfolio wide. A planned approach saves time for managers and money for owners.
Know what you manage
Start with simple data for each building:
- Year built, number of storeys and construction type.
- Last condition inspection and capital works plan.
- Known defects, open leaks and insurance claims.
- Location: harbourside and coastal buildings age faster. See harbourside buildings.
- Warranty periods for newer buildings. See defects periods.

Spot the high-risk buildings
- 1960s and 1970s concrete and brick blocks. See red brick blocks.
- Buildings with repeated leak complaints.
- Buildings with no recent condition report.
- Newer buildings approaching warranty deadlines.
Standardise the process
- Inspection: a consistent condition report format.
- Priorities: safety, water, then appearance.
- Scope: a clear scope or specification for each project. See scope of works.
- Quotes: consistent quote requirements. See the two-quote rule.
- Delivery: standard notices, reporting and handover records.
Use a contractor panel
A short list of vetted builders who know your process saves time on every job. See builder checklist. Review performance regularly: response times, complaints, defects and records.
Report upwards
Give each committee a simple summary: what is urgent, what is planned and what it is likely to cost. Link it to the capital works fund plan so levies are not a surprise.
Seasonal planning
- Inspect roofs, gutters and drains before storm season. See maintenance schedule.
- Schedule external works for drier months where possible.
- Plan pool and podium works for cooler months.
How it helps your business
Fewer emergencies, better meetings and buildings that stay in good condition all help a strata company keep and win clients.
Portfolio support
We can inspect buildings, price repairs consistently and deliver works across your portfolio. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 work. Call 0415 840 500 or book a free inspection.
Frequently asked questions
How should strata companies prioritise remedial works?
Safety first, then water entry, then everything else. Use condition reports and warranty dates to decide which buildings need attention soonest.
Is it worth having a preferred remedial contractor panel?
It can save time and improve consistency, as long as owners corporations still get competitive quotes where required.
How often should strata buildings be inspected?
A full condition report every few years is a sensible guide, with simple annual checks of roofs, drains and balconies.


